Loading…
Loading…
Tender Value
₹1.2 L
EMD Value
₹2,460
Closing Date
26 Aug 2026, 5:00 pm2d left
Ashok Kumar
Municipal Committee Meham
Dismantling, IPB, GSB, Brick Work etc.
2026_HRY_542241_1
2026203B33C0 D167 452A A513 44C2F9F08CB0317ULB
Open Tender
Civil Works
Works
70 days
Meham
Recall Construction of Street and ...
2 documents required · 2 mandatory
₹500
₹2,460
Yes
20 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
26 Aug 2026
20 Aug 2026
20 Aug 2026 - 22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate] | 1 | Sqm | 216 | ₹215.78 |
| 2 | [12.29]Providing and fixing 2nd class teak wood lipping/ moulded beading or taj beading of size 18X5 mm fixed with wooden adhesive of approved quality and screws/nails on the edges of the Pre-laminated particle board as per direction of Engineer-in-charge. [Through Rate] | - | Metre | 48 | - |
| 3 | [17.15.2]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 2. Grading II material [Through Rate] | 1 | cum | 1,044 | ₹1,042.96 |
| 4 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 1 | Sqm | 655 | ₹654.35 |
| 5 | [21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate] | - | Metre | 160 | - |
| 6 | [3.CA026] CA026. Rubbish [Rate] | 1 | cum | 66 | ₹65.93 |
| 7 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 1 | cum | 460 | ₹459.54 |
| 8 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 1 | cum | 4,128 | ₹4,123.87 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_621706.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].