Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.8 LAccepted-AOC | ₹68.8 L Quoted ₹69.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹70.3 LRejected-AOC | ₹70.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹71.0 LRejected-AOC | ₹71.0 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | ASAN JAFFER ALI L3 | VELDURAI & CO L2 | MJD BUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 235 | M3 | 374 ₹87,890 | 370 ₹86,950 | 367 ₹86,245 |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 55 | M3 | 113 ₹6,215 | 112 ₹6,160 | 111 ₹6,105 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 32 | M3 | 332 ₹10,624 | 330 ₹10,560 | 326 ₹10,432 |
| 4.00 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 95 | M3 | 381 ₹36,195 | 377 ₹35,815 | 373 ₹35,435 |
| 5.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 49 | M3 | 162 ₹7,938 | 161 ₹7,889 | 159 ₹7,791 |
| 6.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. - Mixing by manual means | 15 | M3 | 5,618 ₹84,270 | 5,562 ₹83,430 | 5,506 ₹82,590 |
| 7.00 | Damp proof course as per IS 3067:1988 with Cement Mortar 1:4 (One Cement and Four crushed stone sand) 12mm thick mixed with best approved quality Integral liquid water proofing compound conforming to Indian Standard specification as specified by the departmental officers at 2% by weight of cement used , finishing and curing etc. complete complying with standard specification - Manual Mixing | 42 | M2 | 310 ₹13,020 | 307 ₹12,894 | 303 ₹12,726 |
| 8.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 26 | M3 | 5,618 ₹1.5 L | 5,562 ₹1.4 L | 5,506 ₹1.4 L |
| 9.00Brick work in Cement Mortar 1:3 (One cement and three crushed stone sand) using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 9.01 | In Foundation and Basement | 15 | M3 | 6,992 ₹1.0 L | 6,922 ₹1.0 L | 6,852 ₹1.0 L |
Tender Value
₹68.9 L
EMD Value
₹44,500
Closing Date
15 Oct 2025, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Buildings Construction and Maintenance Circle, Tirunelveli
Construction of Veterinary Hospital building at Veeravanallur in Tirunelveli District.
2025_PWD_610181_1
23(2) SE/2025-26 dated 23.09.2025
Open Tender
Civil Works - Buildings
150 days
Veeravanallur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹44,500
13 Mar 2026
30 Sept 2025
16 Oct 2025
30 Sept 2025
15 Oct 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid