| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.0 LAccepted-AOC | ₹74.0 L | L1 | Accepted-AOC Work order awarded to L1 bidder i.e. Ms. Samadhan Enterprises |
| 2 | Rejected-Technical D 90 NATWAR NAGAR DHAULI PYAU MATHURA 281001 U P | MATHURA | MATHURA | UTTAR PRADESH | 281001 | - | - | Rejected-Technical The CA certificate produces by the bidder is having total bill value of while work done value appeared in uploaded UDIN is different. So the authenticity of the issued certificate by CA for TDS cannot be ascertained. Hence, bid is disqualified. |
| 3 | Rejected-Technical | - | - | Rejected-Technical The bidder has not submitted any document on CPP portal within stipulated time. Hence, the bidder is Technically Disqualified. |
| Sl No | Description | Qty | Unit | Samadhan Enterprises L1 |
|---|---|---|---|---|
| 1.00 | Active Area Coating
Providing, painting,spraying & finishing internal surface of primary containment unit #1 & unit #2 Drywell metallic liner surface with Two Coats of " Two component based High Performance - High Solids epoxy coating system (Recommended : Amerlock 400, Amercoat 90series, Apcodur CF641, Neromastic 400NPK, Protectomastic) as per technical and manufacturers specifications" of approved make and required color shade over old painted surface with Airless spray gun of sufficient capacity and orifice size including preparation of surface by manual / mechanical wiping for clean surface, removal of old coat chippings and blisters till a firm layer is reached, etc complete and as directed by the EIC. (Consumption of paint shall not be less than 3.25 Sq.m/Ltr for Two Coats of total thickness 250micron and competable thinner shall be up to 5% of the volume for Two Coats . Including loss factor.)
Note: 1) All Scaffolding material will be provided by the department
2) Labour charges for erection of scaffolding will be paid for under relevant item.
Note: The work is in radioactive area. The exit of tools and tackles from active area to non-active / clean area depends upon contamination level. Tools may need to be left as is, if the contamination level pertains beyond acceptance limit post cleaning/washing. | 2,400 | Sq.M. | 700 ₹16,80,000 Lowest |
| 2.00 | Labour Charges for erection of platform/ scaffolding or any other system to ensure sufficient reach to the linear surface for application of performance coating over the liner surface of drywell #1 & drywell #2 using airless spray. Scaffolding material viz tools, clamps frames, ladders, etc shall be provided by the department as directed by the Engineer-In-Charge. | 400 | Mandays | 1,600 ₹6,40,000 Lowest |
| 3.00 | Charges for idealling Labours engaged in any of the works as per item No. 1 on planned working day due to unavailability of work or hindrance. Idealling charges will be payable as per time management system, as acceptable and directed by Engineer In charge. | 300 | Hours | 400 ₹1,20,000 Lowest |
| 4.00Inactive Area Coating Providing, painting, finishing external walls with Two Coats of " Single component solvented methyl methacrylate base pure Aliphatic acrylate coating system as per technical and manufacturers specifications" of approved make and shade on sand face plaster/ plain plaster and concrete surface over old painted surface including hydrojet blasting, preparation of surface with filling the cracks and crevices with compatible putty etc complete using personnel descending system and support lifeline anchored using parapet anchors as per specifications and as directed by the EIC. (Consumption of paint shall not be less than 0.45 Ltr/ Sq.m/ for Two Coats and compatible thinner shall be 0.15 Ltr/ Sq.m for Two Coats. (Including loss factor) | ||||
| 4.01 | Using Rope access descent system for AFR & AAFR building. | 7,500 | Sq.M. | 500 ₹37,50,000 Lowest |
| 4.02 | Using Rope access descent system for Stack. (Height = 110m) | 2,000 | Sq.M. | 650 ₹13,00,000 Lowest |
| 5.00APPLICABLE TOTAL GST RATE (%) INCLUDED IN THE QUOTED PRICE: | ||||
| 5.01CGST RATE(%) | ||||
| 5.02SGST RATE(%) | ||||
| 5.03IGST RATE(%) | ||||
Tender Value
₹55.9 L
EMD Value
₹1.1 L
Closing Date
9 Nov 2024, 5:00 pmClosed
Chief Superintendent TAPS 1 and 2
NPCIL, TMS, Tarapur, PO_TAPP, Boisar WR, Dist_Palghar, Maharashtra_401 504
Supplying and applying High Performance - High Solids epoxy coating on Liner surface of Drywell _1 and Drywell _2 and Pure aliphatic acrylate coating on Stack and AFR building at TAPS 1and2, Plant Site.
2024_NPCIL_211659_1
TMS / CMM-WORKS / CIVIL-1and2 / 2024 / 2540
Open Tender
Civil Works
Item Rate
365 days
Works
As per NIT
4 documents required · 4 mandatory
₹0
₹1.1 L
13 Aug 2025
19 Oct 2024
12 Nov 2024
19 Oct 2024
9 Nov 2024
29 Oct 2024
19 Oct 2024 - 25 Oct 2024
Amount
Active Area Coating Providing, painting,spraying & finishing internal surface of primary containment unit #1 & unit #2 Drywell metallic liner surface with Two Coats of " Two component based High Performance - High Solids epoxy coating system (Recommended : Amerlock 400, Amercoat 90series, Apcodur CF641, Neromastic 400NPK, Protectomastic) as per technical and manufacturers specifications" of approved make and required color shade over old painted surface with Airless spray gun of sufficient capacity and orifice size including preparation of surface by manual / mechanical wiping for clean surface, removal of old coat chippings and blisters till a firm layer is reached, etc complete and as directed by the EIC. (Consumption of paint shall not be less than 3.25 Sq.m/Ltr for Two Coats of total thickness 250micron and competable thinner shall be up to 5% of the volume for Two Coats . Including loss factor.) Note: 1) All Scaffolding material will be provided by the department 2) Labour charges for erection of scaffolding will be paid for under relevant item. Note: The work is in radioactive area. The exit of tools and tackles from active area to non-active / clean area depends upon contamination level. Tools may need to be left as is, if the contamination level pertains beyond acceptance limit post cleaning/washing.
Labour Charges for erection of platform/ scaffolding or any other system to ensure sufficient reach to the linear surface for application of performance coating over the liner surface of drywell #1 & drywell #2 using airless spray. Scaffolding material viz tools, clamps frames, ladders, etc shall be provided by the department as directed by the Engineer-In-Charge.
Charges for idealling Labours engaged in any of the works as per item No. 1 on planned working day due to unavailability of work or hindrance. Idealling charges will be payable as per time management system, as acceptable and directed by Engineer In charge.
Inactive Area Coating Providing, painting, finishing external walls with Two Coats of " Single component solvented methyl methacrylate base pure Aliphatic acrylate coating system as per technical and manufacturers specifications" of approved make and shade on sand face plaster/ plain plaster and concrete surface over old painted surface including hydrojet blasting, preparation of surface with filling the cracks and crevices with compatible putty etc complete using personnel descending system and support lifeline anchored using parapet anchors as per specifications and as directed by the EIC. (Consumption of paint shall not be less than 0.45 Ltr/ Sq.m/ for Two Coats and compatible thinner shall be 0.15 Ltr/ Sq.m for Two Coats. (Including loss factor)
Using Rope access descent system for AFR & AAFR building.
Using Rope access descent system for Stack. (Height = 110m)
APPLICABLE TOTAL GST RATE (%) INCLUDED IN THE QUOTED PRICE:
CGST RATE(%)
SGST RATE(%)
IGST RATE(%)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .