Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹26.6 L
EMD Value
₹53,184
Closing Date
4 Nov 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ANKIT VASHISHT
Municipal Council Rewari
Construction of Boundary Wall at Shastri Nagar Jhod Ward No 30 MC Rewari
2025_HRY_479906_1
2025A8768CD9 DA47 49FF 9853 F890D6B22619295ULB
Open Tender
Civil Works
Works
150 days
Rewari
2 documents required · 2 mandatory
₹2,500
₹53,184
Yes
28 Oct 2025
28 Oct 2025
5 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
HSR Item 4.12.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer- in-charge. 1. All kinds of soil HSR Rate(Rs.) 78.00 Through Rate
HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) HSR Rate(Rs.) 2442.00 Through Rate
HSR Item 6.14.1-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone- III): 3 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 4374.00 Through Rate
HSR Item 10.8-Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 HSR Rate(Rs.) 181.00 Through Rate
HSR Item 11.8.1-12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) HSR Rate(Rs.) 114.00 Through Rate
HSR Item 3.1.18-By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. HSR Rate(Rs.) 202.00 Rate
HSR Item 6.30.6-Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts HSR Rate(Rs.) 262.00 Through Rate
HSR Item 7.22.1-Brick work with common burnt clay non- modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4404.00 Through Rate
HSR Item 6.8.1-Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 1. 50 mm thick HSR Rate(Rs.) 178.00 Through Rate
HSR Item 7.21.1-Brick work with common burnt clay non- modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4128.00 Through Rate
HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. HSR Rate(Rs.) 68.00 Through Rate
HSR Item 7.70-Extra for bailing / pumping out standing water of pond caused by springs, sub soil water, canal or river seepage and broken water mains or drains except rain water collected in the trenches or foundations before laying brick work. HSR Rate(Rs.) 27.00 Through Rate
HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works HSR Rate(Rs.) 83.00 Through Rate
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_557877.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .