| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹11.1 CrAdmitted-Finance | ₹11.1 Cr | H1 | Admitted-Finance |
| 2 | H2₹10.9 CrAdmitted-Finance | ₹10.9 Cr | H2 | Admitted-Finance |
| 3 | H3₹10.0 CrAdmitted-Finance | ₹10.0 Cr | H3 | Admitted-Finance |
| 4 | H4₹9.8 CrAdmitted-Finance | ₹9.8 Cr | H4 | Admitted-Finance |
| 5 | H5₹8.0 CrAdmitted-Finance | ₹8.0 Cr | H5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NAGENDRA KUMAR PANDEY H1 | FATEH ENVIRO ENGINEERS PVT. LTD. H4 | BAMRAH Pipes H2 | VIRANI ENGICON H3 | MAHAVEER CHEM H5 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | 1.Design and build sewage treatment plant of installed capacity 2.2 MLD and all appurtenant structures and allied works.
2.Construction of 255 m length drainage, including lined at identified outfalls.
3.Construction of 5 nos. Interception and diversion work at designated nallah outfalls.
4.Construction of 1.0 no pumping station.
5.Laying of Pumping Main pipe 100 mm Dia DI-K7 Length-900 m From Pumping Station to the STP / disposal points.
6.Laying of Gravity Main 120 to 245 outer dia. DWC pipe Length-350, 204,190 m from I&D Structural/Outfall to Pumping Station with Sufficient Number Of Manhole.
7.Providing, Laying and installed of Transformer and laying of H.T. 3.5 kms
8.Construction Of Fencing length -200 M | 1 | Lump-Sum | 7,15,07,601 ₹7.2 Cr | 6,00,30,000 ₹6.0 Cr | 6,84,68,463 ₹6.8 Cr | 6,02,50,000 ₹6.0 Cr | 5,66,00,000 ₹5.7 Cr |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | nos | - | - | - | - | - |
| 1.03 | 1st Year | 1 | Lump-Sum | 12,00,000 ₹12 L | 13,05,000 ₹13.1 L | 13,06,000 ₹13.1 L | 12,06,000 ₹12.1 L | 6,68,000 ₹6.7 L |
| 1.04 | 2nd Year | 1 | Lump-Sum | 12,50,000 ₹12.5 L | 13,50,000 ₹13.5 L | 13,84,360 ₹13.8 L | 12,84,360 ₹12.8 L | 6,90,000 ₹6.9 L |
| 1.05 | 3rd Year | 1 | Lump-Sum | 14,00,000 ₹14 L | 14,04,000 ₹14.0 L | 14,67,422 ₹14.7 L | 13,67,422 ₹13.7 L | 7,25,000 ₹7.3 L |
| 1.06 | 4th Year | 1 | Lump-Sum | 15,55,467 ₹15.6 L | 14,67,000 ₹14.7 L | 15,55,467 ₹15.6 L | 14,55,467 ₹14.6 L | 7,57,000 ₹7.6 L |
| 1.07 | 5th Year | 1 | Lump-Sum | 16,48,795 ₹16.5 L | 15,12,000 ₹15.1 L | 16,48,795 ₹16.5 L | 15,48,795 ₹15.5 L | 7,95,000 ₹8.0 L |
| 1.08 | 6th Year | 1 | Lump-Sum | 17,47,723 ₹17.5 L | 15,57,000 ₹15.6 L | 14,47,723 ₹14.5 L | 16,47,723 ₹16.5 L | 8,23,000 ₹8.2 L |
| 1.09 | 7th Year | 1 | Lump-Sum | 18,52,586 ₹18.5 L | 16,02,000 ₹16.0 L | 18,52,586 ₹18.5 L | 17,52,586 ₹17.5 L | 8,56,000 ₹8.6 L |
| 1.10 | 8th Year | 1 | Lump-Sum | 19,63,741 ₹19.6 L | 16,74,000 ₹16.7 L | 19,63,741 ₹19.6 L | 18,63,741 ₹18.6 L | 9,35,000 ₹9.3 L |
Tender Value
₹6.5 Cr
EMD Value
₹3.2 L
Closing Date
13 Apr 2026, 5:30 pmClosed
CMO
NAGAR PARISHAD MAUGANJ
INVITING TENDER FOR INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR MAUGANJ TOWN
2026_UAD_489355_1
3475/NPMau/LWM/1st
Open Tender
Construction Works
365 days
NAGAR PARISHAD MAUGANJ
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹3.2 L
27 May 2026
11 Mar 2026
15 Apr 2026
11 Mar 2026
13 Apr 2026
11 Mar 2026
1.Design and build sewage treatment plant of installed capacity 2.2 MLD and all appurtenant structures and allied works. 2.Construction of 255 m length drainage, including lined at identified outfalls. 3.Construction of 5 nos. Interception and diversion work at designated nallah outfalls. 4.Construction of 1.0 no pumping station. 5.Laying of Pumping Main pipe 100 mm Dia DI-K7 Length-900 m From Pumping Station to the STP / disposal points. 6.Laying of Gravity Main 120 to 245 outer dia. DWC pipe Length-350, 204,190 m from I&D Structural/Outfall to Pumping Station with Sufficient Number Of Manhole. 7.Providing, Laying and installed of Transformer and laying of H.T. 3.5 kms 8.Construction Of Fencing length -200 M
Operation and Maintenance Cost next 10 Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B)
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Power Consuption @ 6.5 Rs per unit
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) ©
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TenderDocumentsLWM.rar
Tender Documents • 27.94 MB
BOQ_577154.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid