| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64,960Accepted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | L1 | Accepted-Finance L1 | |
| 2 | L2₹72,700+₹7,740 (11.9%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹78,770+₹13,810 (21.3%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹99,968+₹35,008 (53.9%)Accepted-Finance | L4 | Accepted-Finance L4 | |
| 5 | L5₹1.0 L+₹35,130 (54.1%)Accepted-Finance | L5 | Accepted-Finance L5 |
Tender Value
₹1.0 L
EMD Value
₹2,000
Closing Date
22 Sept 2022, 11:00 amClosed
EE ETD I KANPUR
EE ETD I KANPUR
Work of Extension of 33KV Jack Bus Including Laying of 33KV AL 400sqmm AL XLPE Underground Cable and Connecting with Overhead Bus For 33KV ALIMCO Bay along with all associated work at 220KV Substation Bithoor Under ETD I Kanpur
2022_UPTCL_722723_1
ET-13/ETD-I (K)/2022-23
Open Tender
Electrical Works
Fixed-rate
90 days
EE ETD I KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
Yes
EE ETD I KANPUR
₹2,000
Yes
22 Sept 2022
23 Aug 2022
22 Sept 2022
23 Aug 2022
22 Sept 2022
23 Aug 2022
Amount
Excavation of 40m length and 2 feet deep cable trench for laying of 3CX400sqmm XLPE, AL underground cable after making proper trench by setting bricks at the bottom along with sand filling. The work also includes backfilling of soil with the help of labour, bricks and sufficient sand to be arranged by contractor.
Erection of 02 Nos of ALP structure(provided by Upptcl) along with providing and fixing of channels for mounting of 03 Nos of PI for cable mounting and fixing work on PI.
Providing and fixing of 400sqmm AL lugs at both end of the cable mounted at PI for each R,Y and B phase using necessary crimping tool and skilled manpower.
Fixing of Suspension insulator at both end of the Jack Bus to be connected using Underground cable. The suspension fitting shall be provided by the department.
Making 03 nos of Zebra Jumper and fixing it on each phase conductor of existing Zebra Jack bus with the help of Zebra-Zebra PG and connecting it with the Underground AL cable mounted on PI with the help of clamp(to be be provided by department)
Fixing of Zebra bus conductors with underground AL cable mounted on PI with the help of clamp
Providing and Fixing of 33KV Outdoor Cable Jointing Kit(3CX400sqmm) along with proper jointing of cable at both end to ensure any moisture ingress.
Carriage of 400 sq mm AL, XLPE cable drum from 132KV Substation Rasoolabad with the help of diesel vehicle (to be arranged by contractor) to 220KV Substation Bithoor. The work includes loading and unloading work at Rasoolabad and bithoor end respectively along with shifting of cable at bithoor switchyard site place.
ASIA ENTERPRISES
S. K. ENGINEERING WORKS
Raj Enterprises
UNITED ENGINEERING CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .