Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Document Found OK |
| 2 | Accepted-Technical | Accepted-Technical Document Found OK |
| 3 | Accepted-Technical | Accepted-Technical Document Found OK |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹54.4 L
EMD Value
₹55,000
Closing Date
5 May 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
132 KV S/S LALKUAN CAMPUS, GHAZIABAD
Increasing capacity at 220 KV S/S Loni
2026_UPTCL_1133176_1
T-08/ETC/GZB/2026
Open Tender
Electrical Works
Fixed-rate
60 days
220 KV S/S Loni
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
AS PER NIT
₹55,000
GHAZIABAD
22 Jun 2026
4 Apr 2026
5 May 2026
4 Apr 2026
5 May 2026
4 Apr 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sorting, Stacking, Loading, Carriage & Unloading of Structure | |||||
| 1.01 | Sorting, counting, stacking, erection mark wise and loading of G.I. structure as per allotment on private truck/trailer at EFU Naini Prayagraj. | - | MT | - | - |
| 1.02 | Safe carriage of loaded structure from EFU Naini Prayagraj to 220kV substation Loni. (Approximate distance is 1500Km To & Fro). | - | Job | - | - |
| 1.03 | Unloading of carriage structure from truck/trailer including shifting, counting & proper stacking of G.I. structure at 220 kV substation Loni as per direction of SDO/JE. | - | MT | - | - |
| 2Shifting, loading, carriage and unlodading of 220/132 KV 160 MVA Transformer at 220 KV substation Loni and its erection, testing and commissioning | |||||
| 2.01 | Shifting/dragging of 160 MVA Transformer main tank from unloading site to transformer plinth up to 20 mtrs distance including turning of transformer if required including all T&P and other works to complete the job satisfactory at 220 KV S/S Loni. | - | Job | - | - |
| 2.02 | Additional Shifting of the Tank of above Transformer. (1 Job for every 5 Meter). | - | Job | - | - |
| 2.03 | Complete, erection of new 160 MVA T/F work includes erection of radiator, conservator tank, turrets, connecting of all oil pipe line, HV/LV/Neutral bushing, erection of cooling fans, OLTC drive mechanism box, making control cables connection, OTI, WTI, buchholz relay etc. connection for completing the work. | - | Job | - | - |
| 2.04 | Centrifuging of T/F oil, uninterrupted till the desired BDV value of the oil is achieved and then filling & topping up of the centrifuged T/F oil in transformer as per standard procedure to maintain required oil level in the transformer including commissioning of air cell if required. Centrifuging and circulation of transformer oil in the transformer, uninterrupted till the desired BDV value of the oil & IR values of bushing are achieved including hourly recording of all the parameters sach as Temp. Vacuum and insulation resistance etc. Centrifuging machine (Minimum 12KL capacity with 2Nos high vaccume pump of capacity 3000RPM and root pump of capacity 1500RPM) its operator and associated T&Ps shall be arranged by contractor at its own cost. | - | KL | - | - |
| 2.05 | Erection of RTCC panel of new 160MVA, 220/132KV Transformer after shifting of RTCC panel from store/designated place to control room , then making earthing of RTCC Panel. | - | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_2115224.xls
BOQ • 0.42 MB
doc_08.pdf
Tender Documents • 1.01 MB
loni.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .