Loading…
Loading…
Tender Value
₹292.7 Cr
EMD Value
₹5.9 Cr
Closing Date
23 Jul 2026, 12:00 pmClosed
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
CE/CON/II
18 conditions · 2 needing a document upload
Clause 2.2.2.2 of RFP: Financial Capacity: The Bidder shall have a minimum Net Worth (the "Financial Capacity") of Rs. 14,63,29,731.30/- (Rs. Fourteen crore Sixty three lakh twenty nine thousand seven hundred thirty one and thirty paise only) at the close of the preceding Financial Year.
Please see more details in RFP document as attached.
Clause 2.2.2.1 of RFP: Technical Capacity: For demonstrating Technical Capacity and experience (the "Technical Capacity"), the Bidder shall, during the last 5 (five) previous financial years and the current financial year up to the Base month (not to be read with para-2.1.13). (i) have received payments for construction of Eligible Project(s), or has executed construction works by itself in a PPP project, such that the sum total thereof, as further adjusted in accordance with clause 2.2.2.4 (i) & (ii), is more than 2.5 (two and half) times the Estimated Project Cost (the "Threshold Technical Capacity"). Provided that at least one fourth of the Threshold Technical Capacity shall be from the Eligible Projects in Category 1 and/ or Category 3 specified in Clause 2.2.2.4 (i) & (ii). (ii) Completed (executed) or Substantially completed$(executed) at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than 50% (fifty per cent) of the Estimated Project Cost. However, in case of Consortium/Joint Venture, the other members of Consortium/Joint Venture (who are not considered for satisfying this technical Capacity under this clause) also must have Completed (Executed) or Substantially completed$ at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than 10% (ten) per cent of the Estimated Project Cost. (iii)(a) Completed (executed) or substantially completed$ (executed) at least one similar work of value of not less than [20% (Twenty percent)] of the estimated project cost. OR (b) Completed (executed) or substantially completed$ (executed) at least two similar works of value of not less than [10% (Ten percent)] of the estimated project cost. Illustration for 'received payments for not less than 75 (seventy-five) percent': For contract wherein there is provision for part payment 'procurement of goods and equipment' on basis of indemnity bond/Bank Guarantee. In all such contract, 'received payments for not less than 75 (seventy-five) per cent value of present Contract Value payment' means not less than 75% payment received under 'procurement of goods and equipment' as well as not less than 75% payment received under 'execution/installation/commissioning'. For avoidance of doubt, in above cl. 2.2.2.1 (i), (ii) & (iii), the amount of payment received for eligible projects or amount of payments received against PPP project shall be considered for last past 5 (five) previous financial Years and current financial year up to the base month even if project was started earlier than the said reckoned period. The meaning of executed shall be considered as completed or in progress.
[Note:- For composite works of New lines, Gauge Conversion, Doubling, 3rd line, 4th line etc. with Railway electrification and/or Signalling and telecommunication works - 1.In case scope involves the electrification work as per item No. 3 of Annexure -I of Schedule -B value as mentioned in Annexure- G, the selected bidders can himself execute above Electrification work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated electrification work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute electrification work involved in project by engaging sub- contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include overhead equipment system of Railway electrification for a railway system, metro system, suburban transit system, high speed railways, substation and transmission lines, and/or 2. In case scope involves the Signalling and Telecommunication work as per item No. 2 of Annexure-I of Schedule-B value as mentioned in Annexure-G, the selected bidders can himself execute above Signalling and Telecommunication work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated Signalling and Telecommunication work as mentioned in Schedule- G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute Signalling and Telecommunication work involved in project by engaging sub-contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include Signalling and Telecommunication of railway system, metro system, suburban transit system, high speed railways.]
Please also see clause 2.2.2.3 to 2.2.2.9 of RFP document as attached.
Please see more details in RFP document as attached.
Definition of similar work: "Any composite Railway project work including all Civil Engineering, Permanent Way and Railway Electrification works".
41 conditions · 15 needing a document upload
LETTER COMPRISING THE TECHNICAL BID is to be furnished as per APPENDIX-IA of RFP document as attached.
Letter comprising the Financial Bid is to be furnished as per APPENDIX- IB of RFP document as attached.
Format for Power of Attorney for signing of Bid as per the format at Appendix-II in RFP document as attached.
If applicable, Power of Attorney for Lead Member of {Consortium/Joint Venture} as per the format at Appendix-III in RFP document as attached.
If applicable, Joint Bidding Agreement for {Consortium/Joint Venture} as per the format at Appendix-IV in RFP document as attached.
An undertaking from the person having Power of Attorney referred to in Sub. Clause-(b) above that they agree and abide by the Bid Documents uploaded by Authority and amendments uploaded, if any.
Copy of Memorandum and Articles of Association, if the Bidder is a body corporate, and if a partnership then a copy of its partnership deed.
Copies of duly audited complete annual accounts of the Bidder or of each member (in case of Joint Venture/Consortium) for preceding 5 years.
Appendix-IB shall be submitted online through e-procurement portal on or before 12:00 hrs IST on Bid due date.
Appendix-IC shall be submitted online through e-procurement portal on or before 12:00 hrs IST on Bid due date towards Contractor's Work Plan with full details of manpower, machinery, equipment, number of simultaneous sites listing all the activities from mobilization to completion along with S curves for all major activities like Earthwork, Concreting, Steel work etc.
Details of bidder is to be furnished as per Annexure I of RFP document as attached.
Technical Capacity of the Bidder is to be furnished as per Annexure II of RFP document as attached.
Financial Capacity of bidder is to be furnished as per Annexure III of RFP document as attached
Details of Eligible Projects is to be furnished as per Annexure IV of RFP document as attached.
Statement of Legal Capacity is to be furnished as per Annexure V of RFP document as attached.
Earnest Money Deposit (Bid security): Payment of Earnest Money deposit (Bid Security) in respect of e-tendering, will be accepted through e- payment Gateway of Authority or submitted as Bank Guarantee Bond from a Scheduled Commercial Bank of India only and shall be refundable not later than 200 days from Bid Due Date. (RFP clause 1.2.4 as attached).
The tenderer shall upload scanned copies of mandatory credentials such as experience, turn over Certificates and any other documents as applicable.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
"Construction of 3rd line work including earth work, blanketing, minor bridges, major bridges, LC work and other miscellaneous works for DFC feeder route of Indian Railway Standard Loading, execution of indoor & outdoor S&T works, execution of general electrical works, installation and commissioning of overhead equipment (OHE) for traction and power supply in connection with the 3rd Line work of Chandil-Purulia section in Adra Division of South Eastern Railway." on Engineering, Procurement & Construction (EPC) Mode.
4628-GRC-CE-C-II-12-2026
4628-GRC-CE-C-II-12-2026
Open
Works - General
36 Months
Unknown (Unspecified Location)
₹0
₹5.9 Cr
23 Jul 2026
4 Jun 2026
9 Jul 2026
305 items across 5 schedules · ₹51,05,59,424.6 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | For utility shifting Work under NS items/SERUSSOR 2021/CPWD DSR 2023 & S&T SERSOR 2021 | Lumpsum | 1.00 | 4,16,31,534 | 4,16,31,534 |
| Schedule total | ₹4,16,31,534 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
LCJC-231-Model.pdf
ATTACHMENT
LCJC-241-Model.pdf
ATTACHMENT
LCJC-251-Model.pdf
ATTACHMENT
LCJC-551-Model.pdf
ATTACHMENT
shno.1_compressed.pdf
ATTACHMENT
shno.2_compressed.pdf
ATTACHMENT
shno.3_compressed.pdf
ATTACHMENT
shno.4_compressed.pdf
ATTACHMENT
shno.5_compressed.pdf
ATTACHMENT
shno.6_compressed.pdf
ATTACHMENT
shno.7_compressed.pdf
ATTACHMENT
shno.8_compressed1.pdf
ATTACHMENT
shno.10_compressed.pdf
ATTACHMENT
shno.10_compressed_2.pdf
ATTACHMENT
shno.11_compressed.pdf
ATTACHMENT
shno.12.pdf
ATTACHMENT
BR.NO-348.pdf
ATTACHMENT
BR.NO-381.pdf
ATTACHMENT
BR.NO-382.pdf
ATTACHMENT
BR.NO-392.pdf
ATTACHMENT
BR.NO-394.pdf
ATTACHMENT
BR.NO-414.pdf
ATTACHMENT
BRNO362.pdf
ATTACHMENT
BRNO-377.pdf
ATTACHMENT
BRNO-383.pdf
ATTACHMENT
BRNO-389.pdf
ATTACHMENT
BRNO--405.pdf
ATTACHMENT
BRNO.360.pdf
ATTACHMENT
BRNO-36566717890919395969798.pdf
ATTACHMENT
BRNO-34546474950.5152525357586163.pdf
ATTACHMENT
CABLEROUTEPLAN_compressed.pdf
ATTACHMENT
OTHERDRAWING1_compressed.pdf
ATTACHMENT
TracksideIndicatorBoardsAndSignages_11zon.pdf
ATTACHMENT
NewFormationGuidelinesGEG4Sept2020-1part1_11zon.pdf
ATTACHMENT
NewFormationGuidelinesGEG4Sept2020-1part2_11zon1.pdf
ATTACHMENT
RUBMERGED_11zon_1.pdf
ATTACHMENT
otherdrwng3_compressed.pdf
ATTACHMENT
CBS-0044_merged_compressed.pdf
ATTACHMENT
10151merged_compressed.pdf
ATTACHMENT
10156_1_merged_compressed.pdf
ATTACHMENT
RDSO10284_compressed.pdf
ATTACHMENT
RDSO10287_compressed.pdf
ATTACHMENT
RDSO6.1METRE_compressed.pdf
ATTACHMENT
11761_merged-PDF_11zon.pdf
ATTACHMENT
RDSO_merged.pdf
ATTACHMENT
10157PART1RDSO_11zon.pdf
ATTACHMENT
10157PART2RDSO_11zon.pdf
ATTACHMENT
SUBWAYJC-48-Model1.pdf
ATTACHMENT
SUBWAYJC-39-Model2.pdf
ATTACHMENT
SUBWAYJC-32-Model1.pdf
ATTACHMENT
SUBWAYJC-20-Model1.pdf
ATTACHMENT
SHEET12KM325-320_V8_APPROVE_P35.pdf
ATTACHMENT
INTERLOCKINGGATEGOOMTY_V4_APPROVE_P21.pdf
ATTACHMENT
GADMAJORBR.NO-348_V6_AXEN-CON-DD-GRC_T_P19.pdf
ATTACHMENT
EPCContractSafetyandSecurity.pdf
ATTACHMENT
RFPDocument.pdf
ATTACHMENT
BRNO-4023415344A_compressed.pdf
ATTACHMENT
BR_NO-364to413merged_compressed.pdf
ATTACHMENT
EPCDocument_2.pdf
ATTACHMENT
Corrigendum3.pdf
CORRIGENDUM
RFPDocument.pdf
CORRIGENDUM
AddendumandCorrigendumNo1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .