Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance | ₹4.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.5 L+₹1,156.92 (0.26%)Rejected-Finance TAMIL NADU | VELLORE | TAMIL NADU | 632001 | ₹4.5 L+₹1,156.92 (0.26%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | A M Hari L1 | M/S VSP CONSTRUCTIONN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B Core wall | 1.14 | cum | 122.75 ₹139.94 Lowest | 124 ₹141.36 |
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B Earth Work | 14.11 | cum | 246 ₹3,471.06 Lowest | 247.29 ₹3,489.26 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 18.68 | cum | 5,081.09 ₹94,914.76 Lowest | 5,083 ₹94,950.44 |
| 4.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 12.17 | cum | 6,464.55 ₹78,673.57 Lowest | 6,466.17 ₹78,693.29 |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 6.24 | cum | 5,814 ₹36,279.36 Lowest | 5,816.64 ₹36,295.83 |
| 6.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete,core wall Lane outer | 9.03 | cum | 171 ₹1,544.13 Lowest | 172.23 ₹1,555.24 |
| 7.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete,Side wall, Deck bottam,all round | 14.58 | cum | 513.07 ₹7,480.56 Lowest | 515.42 ₹7,514.82 |
| 8.00 | Supplying and fabricating and placing in position MS or RTS reinforcement works | 88.52 | cum | 88.41 ₹7,826.05 Lowest | 90 ₹7,966.8 |
| 9.00 | Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly | 0.63 | cum | 8,781.59 ₹5,532.4 Lowest | 8,789.59 ₹5,537.44 |
| 10.00 | Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 10.35 | cum | 547 ₹5,661.45 Lowest | 550.11 ₹5,693.64 |
Tender Value
Refer Docs
EMD Value
₹4,610
Closing Date
7 Feb 2025, 3:00 pmClosed
Block Development officer,walajah
Block Development office,Walajah
Providing For CC Pavement and road marking with hot applied thermoplastic at service road street 1and cross street in Emerald nagar H/O Nowlock Panchayat in Walajah Union
2025_RDTN_523352_1
A2/2503/2024
Open Tender
Civil Works
Works
90 days
Block Development office, Walajah
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,610
1 Sept 2026
6 Feb 2025
7 Feb 2025
6 Feb 2025
7 Feb 2025
6 Feb 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_623002.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .