Loading…
Loading…
Tender Value
₹24.0 L
EMD Value
₹48,000
Closing Date
23 Jul 2026, 4:00 pm
Executive Eng. II
Construction office,P.U. Campus
Construction of Pantry and Attached Washroom Adjacent to Chairperson Room and Renovation of Gents Washroom including toilets for PwDs and renovation of gents toilet of ground floor in the Department of Geography, Panjab University, Sector-14, Chd
2026_PU_93708_1
6879/EE/Mtc.
Open Tender
Civil Works
120 days
P.U. Campus Sector-14
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹48,000
1 Jul 2026
1 Jul 2026
24 Jul 2026
1 Jul 2026
23 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Public Health Work | |||||
| 1.01 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 5 km for all lifts, complete as per directions of Engineer-in-charge. (Ref:- 1.1.18) | 35 | Cum | 180 | ₹6,300 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (Ref:- 4.1.3) | 9.38 | Cum | 8,289 | ₹77,750.82 |
| 3Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 3.01 | 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (Ref:- 5.2.3) | 0.25 | Cum | 11,230 | ₹2,807.5 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 4.01 | Suspended floors, roofs, landings, balconies and access platform.(Ref:- 5.9.3) | 3.54 | Sqm | 691 | ₹2,446.14 |
| 5Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | |||||
| 5.01 | TMT bar 10 mm dia (Ref:- 5.22.6) | 46.74 | Kg | 102 | ₹4,767.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.48 MB
BOQ_114800.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid