Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 155 SHAMPURA COLONY BELA ROAD RUPNAGAR 140001 | RUPNAGAR | RUPNAGAR | PUNJAB | 140001 | ₹1.5 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹1.5 Cr+₹16,035 (0.11%)Rejected-Finance 1 VISHVAS NAGAR GONIANA ROAD P O NFL BATHINDA 151 003 | BATHINDA | BATHINDA | PUNJAB | 151003 | ₹1.5 Cr+₹16,035 (0.11%) | L2 | Rejected-Finance Hiighest bidder |
| 3 | L3₹1.5 Cr+₹80,175 (0.53%)Rejected-Finance SCO NO 14 TRANSPORT NAGAR REGD BATHINDA 151003 PUNJAB | BATHINDA | BATHINDA | PUNJAB | 151003 | ₹1.5 Cr+₹80,175 (0.53%) | L3 | Rejected-Finance Hiighest bidder |
| Sl No | Description | Qty | Unit | Alex Engineering L3 | M/S SODHI ERECTORS L1 | Gill Engineering Pvt. Ltd. L2 |
|---|---|---|---|---|---|---|
| 1.01 | Routine maintenance, breakdown mtc., preventive mtc. and overhauling jobs of various mechanical auxiliaries such as, DM plant, Water based fire fighting system complete with fire fighting pumps, Air compressors, Self Cleaning Filter’s of ACW, Plate Heat Exchangers of DM Cooling Water, Raw water pumps, Service water pumps, APH wash pumps, Sludge disposal pumps, Re-claimation pumps, Chemical dozing pumps, Acid/Alkali handling pumps, Potable water pumps and Misc. Horizontal/Vertical/ Submersible sump pumps. Various pumps and auxiliaries installed at Pre-treatment plant, Water Clarification plant, Effluent treatment plant, Ash water recovery system, Raw water Chlorination and CW Chlorination system. Loading/unloading of hydrogen gas cylinders. Concerned EOT/HOT cranes/hoists. All connected LP piping, NRVs and valves etc. including LP piping, NRVs and valves etc. before suction and after discharge valve of CW, BACW, TACW, Hot well make up, Stator water make up, Boiler fill, ACW, SGDMCW, TGDMCW and TG cycle make up pumps. Operation and maintenance of mechanical workshop and Plant drainage sump pumps installed at Sump Pump No. 1and2, of 2x210 MW Stage-I and 2x250 MW Stage-II, GHTP, Lehra-Mohabbat, on Lump-sum basis. | 12 | Months | 14,30,000 ₹1,71,60,000 | 13,08,000 ₹1,56,96,000 Lowest | 14,25,000 ₹1,71,00,000 |
| 2.00Laying of MS ERW Pipes of following sizes: (Scope of work Section-VIII.E):- | ||||||
| 3.00Above ground | ||||||
| 3.01 | 250/300/350 NB | 500 | Meters | 198 ₹99,000 | 80 ₹40,000 Lowest | 270 ₹1,35,000 |
| 3.02 | 100/125/150/200 NB | 700 | Meters | 198 ₹1,38,600 | 60 ₹42,000 Lowest | 270 ₹1,89,000 |
| 3.03 | 25/40/50/65/80 NB | 300 | Meters | 198 ₹59,400 | 35 ₹10,500 Lowest | 270 ₹81,000 |
| 4.00Underground: | ||||||
| 4.01 | 250/300/350 NB | 150 | Meters | 450 ₹67,500 | 150 ₹22,500 Lowest | 360 ₹54,000 |
| 4.02 | 100/125/150/200 NB | 150 | Meters | 450 ₹67,500 | 120 ₹18,000 Lowest | 360 ₹54,000 |
| 4.03 | 25/40/50/65/80 NB | 100 | Meters | 450 ₹45,000 | 70 ₹7,000 Lowest | 360 ₹36,000 |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
21 Jul 2025, 11:30 amClosed
Dy. Chief Engineer/OM
Dy. Chief Engineer/OM, Mechanical Mtc. Circle-I, GHTP, Lehra-Mohabbat
., connected LP Piping and Valves, operation and maintenance of Mechanical Workshop and Plant drainage pumps of 2x210 MW and 2x250 MW GHTP Stage-I and II, on lump sum basis for a period of one year.
2025_POWER_142566_1
167/MM-I/MAMC-273/OM/GHTP/2025
Open Tender
Power/Energy Projects/Products
Tender cum Auction
365 days
Mechanical Mtc. Circle-I, GHTP, Lehra-Mohabbat
Please refer tender documents
3 documents required · 3 mandatory
₹2,360
₹3.4 L
29 Aug 2025
16 Jun 2025
23 Jul 2025
16 Jun 2025
21 Jul 2025
16 Jun 2025
Amount
Routine maintenance, breakdown mtc., preventive mtc. and overhauling jobs of various mechanical auxiliaries such as, DM plant, Water based fire fighting system complete with fire fighting pumps, Air compressors, Self Cleaning Filter’s of ACW, Plate Heat Exchangers of DM Cooling Water, Raw water pumps, Service water pumps, APH wash pumps, Sludge disposal pumps, Re-claimation pumps, Chemical dozing pumps, Acid/Alkali handling pumps, Potable water pumps and Misc. Horizontal/Vertical/ Submersible sump pumps. Various pumps and auxiliaries installed at Pre-treatment plant, Water Clarification plant, Effluent treatment plant, Ash water recovery system, Raw water Chlorination and CW Chlorination system. Loading/unloading of hydrogen gas cylinders. Concerned EOT/HOT cranes/hoists. All connected LP piping, NRVs and valves etc. including LP piping, NRVs and valves etc. before suction and after discharge valve of CW, BACW, TACW, Hot well make up, Stator water make up, Boiler fill, ACW, SGDMCW, TGDMCW and TG cycle make up pumps. Operation and maintenance of mechanical workshop and Plant drainage sump pumps installed at Sump Pump No. 1and2, of 2x210 MW Stage-I and 2x250 MW Stage-II, GHTP, Lehra-Mohabbat, on Lump-sum basis.
Laying of MS ERW Pipes of following sizes: (Scope of work Section-VIII.E):-
Above ground
Underground:
Deployment of manpower for unforeseen jobs (Scope of work Section-VIII.F):-
Fitter/welder
Turner/Machinist
Skilled worker
Un-Skilled worker
Bidder Name
Amount in Words
M/S SODHI ERECTORS (BID ID -662834)
Gill Engineering Pvt. Ltd. (BID ID -659805)
Alex Engineering (BID ID -658146)
Gill Engineering Pvt. Ltd. (BID ID -659805)
Alex Engineering (BID ID -658146)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .