| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.2 LAccepted-AOC | ₹22.2 L Quoted ₹18.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹19.2 L+₹38,304.34 (2.04%)Rejected-AOC | ₹19.2 L+₹38,304.34 (2.04%) | 2 | Rejected-AOC L2 |
| 3 | 3₹20.3 L+₹1.5 L (8.03%)Rejected-AOC | ₹20.3 L+₹1.5 L (8.03%) | 3 | Rejected-AOC L3 |
| 4 | 4₹21.1 L+₹2.4 L (12.6%)Rejected-AOC | ₹21.1 L+₹2.4 L (12.6%) | 4 | Rejected-AOC L4 |
| 5 | 5₹21.2 L+₹2.5 L (13.1%)Rejected-AOC | ₹21.2 L+₹2.5 L (13.1%) | 5 | Rejected-AOC L5 |
Tender Value
₹22.5 L
EMD Value
₹22,530
Closing Date
17 Jul 2026, 3:00 pmClosed
ASSISTANT COMMISSIONER ZONE-1
NO. 945, VALLALAR HIGH ROAD THIRUVOTRIYUR CHENNAI 19
RESTORATION TO ROAD CUT MADE BY CMWSSB AT ELLAIAMMAN KOVIL STREET IN DIVISION-11, UNIT-03, ZONE-01.
2026_CoC_684763_1
Z.O.1.C.No.B2/2213/2026
Open Tender
Civil Works
Works
30 days
Thiruvotriyur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹22,530
28 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation And Deposting on Bank With Initial Lead of 10 m And Initial Lift of 2m In Hard Stiff Clay Stiff Black Hard Shales Muram Gravel Stoney Earth And Earth Mixed With Small Size Boulders And Hard Gravelly Soil (SS 20A) | 250 | CUM | 156.4 | ₹39,100 |
| 2 | Providing and Laying Granular sub base (GSB) by provided close graded material confirming to ( table 400-1) mixing in a mechanical mix plant at OMC carriage of mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacted with vibratory power roller to achieve the desired dry density to the required grade and cross slope as per drawings all others incidental charges etc.complete as per clause of 401 Morth Specification using Grade III metals for Top layer | 100 | CUM | 2,060.54 | ₹2,06,054 |
| 3 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250 mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 79.5 | CUM | 2,709.1 | ₹2,15,373.45 |
| 4 | Cold Milling of Existing Asphalt surface to the required depth using milling machine including hire and running charges for the machine cleaning the milled surface as to avoid slippery including all other incidential charges and other unforeseen charges etc. complete | 56 | CUM | 3,277.09 | ₹1,83,517.04 |
| 5 | Conveyance Charges for milling materials to the work site to designated dumping yard | 56 | CUM | 393.75 | ₹22,050 |
| 6 | Providing and laying Tack Coat 2.5 kg/10 m2 with Bitumen Emulsion (Rapid Setting 1)(Procured from State/ Central Public sector undertakings only) including cost of bitumen emulsion at the site, including labour charges for preparing the surface and applying required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete over the primed surface as per clause 503 of MoRT& H Specifications Rev.5 | 1,386 | SQM | 19.25 | ₹26,680.5 |
| 7 | Providing And Laying 50mm Consolidated Thick Bituminous Macadam Using 0.283 Cu.m of 25-10mm Metal 0.283 Cu.m of 10-5mm Metal 0.1415 Cu.m of 5mm And Below Size Irc Metal With 37 Kgs of Vg30 (60/70 Grade) Bitumen ( Procured from State/ Central Public sector undertakings only) For Premixing Per 10Sq.m Including Cost And Conveyance of All Materials to Work Site And Stacking Them On Road Side To Standard Departmental Metric Gauge For Pre-Measurement Heating The Bitumen In Bitumen Boiler Heating The Aggregates And Mixing Them With Bitumen In Mini Hot Mix Plant Spreading The Mix In The Required Temperature For Uniform Thick of 50mm Over A Previously Prepared Surface To Specified Grade And Cross Section And Consolidated By 8-10 Tonne Vibratory Roller To The Required Density Including Labour Charges Spreading Etc. Including Hire Charges For Machineries And All Other Tools Including Fuel And All Other Incidental Charges Etc. Complete As Per Clause 504 of Morth Rev-5 | 1,386 | SQM | 460.75 | ₹6,38,599.5 |
| 8 | Providing and laying Tack coat over the existing bituminous surface using 2.0 kgs of bitumen emulsion (Rapid Setting 1) ( Procured from State/ Central Public sector undertakings only) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the surface, and applying the required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete as per Clause 503 of MoRT&H Specifications Rev.5 | 1,386 | SQM | 30.83 | ₹42,730.38 |
| 9 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00- 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen ( Procured from State/ Central Public sector undertakings only) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 1,386 | SQM | 369.63 | ₹5,12,307.18 |
| 10 | CONVEYANCE BY ROADS IN PLAINS 0 TO 10KM INCLUDING LOADING UNLOADING AND TRANSPORTATION CHARGES | 250 | CUM | 225 | ₹56,250 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
2213.pdf
Tender Documents • 1.68 MB
BOQ_823134.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .