Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC TAILOR MARKET MAIN BAZAAR MANDI ADAMPUR 125052 | HISAR | HARYANA | 125052 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.1 L+₹14,220 (2.85%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹4.8 L
EMD Value
₹9,600
Closing Date
28 Feb 2020, 5:00 pmClosed
Ravi Ladwal, EE
Executive Engineer Elect. Division PWD B and R Hisar
Construction of Govt. I.T.I Nandgaon in Distt. Bhiwani (Pdg. LAN System only).
2020_HRY_118051_1
PWD/Elect-GGR/Elect-HSR/16884
Open Tender
Construction Works
Works
60 days
Hisar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer, Elect. Division PWD B and R Br
₹9,600
9 Sept 2020
13 Feb 2020
3 Mar 2020
13 Feb 2020
28 Feb 2020
13 Feb 2020
Amount
Supply, Errection testing & Commissioning of UTP cat 6 information outlet( RED - for Data - User End) complte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. D-Link/ Molex/ Schiender Make.
Supply,Errection testing & Commissioning of UTP Face plate(Single/dual) complte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. D-Link/ Molex/ Schiender Make.
Supply,Errection testing & Commissioning of UTP cat 6 Mounting Patch Cords Low smoke zero helogene (LSZH/LS0H )complte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. D-Link/ Molex/ Schiender Make. 3 FT lenth
7 FT lenth
Supply,Errection testing & Commissioning of UTP cat 6 24 port jack pannel complte in all respect upto the entire satisfaction of Engineer-in-Charge of the work. D-Link/ Molex/ Schiender Make.
Supply,Errection testing & Commissioning of Edge Switch 24 Port 10/100/1000 plus 4 FFP Layer 2 manageble Base T Manageble auto sense, Ethernet switch complete in all respect up to the entire satisfaction of Engineer-in charge of work . Make:WS-C CISCO 2960X -24TS-L/Allied/Extreme.
Supply,Errection testing & Commissioning of 12U rack with cable manager,fan tray,power distribution kit complete in all respect.Make: HCL/Comrack/Wallrack/Netrack
Supply,Errection testing & Commissioning of of 1 KVA On line UPS with 3 nos 12 v 17AH exite make batteries & stand for batteries complete in all respect.Make: APC/Emerson/Microtek
S/E of PVC conduit pipe ISI marked (Medium) recessed in wall/ ceiling etc. including cost of PVC bends, inspection box and all other material required to complete the job in all respect up to the entire satisfaction of Engineer-in-Charge of the work. (HSR 31.44) b) 25mm dia
S/E/T/C of Cat-6 cable in existing PVC conduit /PVC channel complete in all respect with all labour and material required to complete the job in all respect. (HSR 31.80).
NB TECHNOLOGIES INDIA
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .