Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.6 LAccepted-Finance | L1 | Accepted-Finance LOWEST BIDDER | |
| 2 | L2₹70.6 L+₹1.1 L (1.54%)Rejected-Finance GANDHI CHOWK MANIPURA JAISALMER RAJ 345001 | JAISALMER | JAISALMER | RAJASTHAN | 345001 | L2 | Rejected-Finance OTHER THEN LOWEST BIDDER | |
| 3 | L3₹76.2 L+₹6.6 L (9.51%)Rejected-Finance | L3 | Rejected-Finance OTHER THEN LOWEST BIDDER | |
| 4 | L4₹77.3 L+₹7.8 L (11.2%)Rejected-Finance | L4 | Rejected-Finance OTHER THEN LOWEST BIDDER | |
| 5 | Rejected-Technical 77 KAILASH PURI BIKANER RAJASTHAN PIN 334001 | BIKANER | RAJASTHAN | 334001 | - | Rejected-Technical THE FIRM IS CONSIDERED NOT CAPABLE OF HANDLING OF MORE WORK LOAD AS PER WLR OF HQ CESC PUNE QE JUN 2026 |
| Sl No | Description | Qty | Unit | BHAGWATI CONSTRUCTION L2 | Bhawani Constructions L4 | KHUSBU CONSTRUCTION COMPANY L3 | M/S R.K. Builders & Developer L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | M&L for preparation of new plastered surface and applying two coat of white or tinned with cement base paint over priming coat on exterior wall complete all as specified and directed by Engr-in-Charge. | 400 | Sqm | 40 ₹16,000 Lowest | 100 ₹40,000 | 70 ₹28,000 | 80 ₹32,000 |
| 2.00 | M & L for preparation of new plastered/concrete surfaces of walls, providing minumum 1mm thick Birla white wall care putty to achieve smooth surfaces and applying two coats of Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer,of
required shade and colour complete, as per manufacturer's specification. over a coat of compatiable priming paint complete all as specified. | 90 | SM | 60 ₹5,400 Lowest | 150 ₹13,500 | 170 ₹15,300 | 100 ₹9,000 |
| 3.00 | M&L for prepration of newly plastered surface and applying two coats of white wash on plastered surfacesof wall all as specified and directed. | 72 | SQM | 20 ₹1,440 Lowest | 30 ₹2,160 | 30 ₹2,160 | 30 ₹2,160 |
| 4.00 | M&L for prepration of newly plastered ceiling surface and applying two coats of white wash on plastered surface all as specified and directed. | 80 | SQM | 20 ₹1,600 Lowest | 35 ₹2,800 | 30 ₹2,400 | 30 ₹2,400 |
| 5.00 | Complete removal existing treatment and applying 1mm thick of Birla white wall care putty to achieve smooth surfaces and applying two coats of Oil Bound Distemper of approved shade/tint over a coat of compatiable priming paint complete all as specified and as directed. | 3,160.2 | Sqm | 60 ₹1,89,612 Lowest | 120 ₹3,79,224 | 150 ₹4,74,030 | 100 ₹3,16,020 |
| 6.00 | M&L for preparation of old plastered surfaces of ceiling and applying two coats of white wash complete all as specified and directed. | 1,553.8 | Sqm | 20 ₹31,076 Lowest | 30 ₹46,614 | 30 ₹46,614 | 20 ₹31,076 Lowest |
| 7.00 | M & L for preparation of old painted wooden surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 164.67 | Sqm | 50 ₹8,233.5 Lowest | 50 ₹8,233.5 Lowest | 90 ₹14,820.3 | 50 ₹8,233.5 Lowest |
| 8.00 | M&L for preparation of old painted steel surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 122.88 | Sqm | 50 ₹6,144 Lowest | 50 ₹6,144 Lowest | 50 ₹6,144 Lowest | 50 ₹6,144 Lowest |
| 9.00 | M&L for Chipping of slab/columns/ beams/chajjas /parapet /roof projection/ balcony/ staircase and removing loose mortar with chisel hammer without much impact on concrete surface, clean the surface by sand blasting the surface using river sand with minimum of 6 kg pressure at the nozzle or air blow by electric pressure blower by mechanical compressor, cleaning the exposed reinforcement with wire brushes etc and disposal of debris for all lead and lifts complete all as specified and directed by Engineer-in-Charge.
Note :- Scaffolding/ temporary support structure required to support the members / structure during strengthening shall be measured and paid under Ser item No.1. | 300 | Sqm | 50 ₹15,000 Lowest | 250 ₹75,000 | 180 ₹54,000 | 200 ₹60,000 |
| 10.00 | M&L for applying bond coat on the prepared old surface of concrete/ masonry to receive micro concrete with two coats of Sika-Latex Super SBR or equivalent make of brand & as per manufacturer specifications. Laying of reinstatement polymer mortar or micro concrete shall be completed within the overlay time of bonding coat. This bond coat act as bonding agent between old and new concrete complete all as specified and directed by Engineer-in-Charge. | 300 | Sqm | 300 ₹90,000 | 300 ₹90,000 | 200 ₹60,000 Lowest | 280 ₹84,000 |
Tender Value
₹70.8 L
EMD Value
₹1.3 L
Closing Date
4 Sept 2026, 6:00 pmClosed
CWE (A) Jaisalmer
HQ CWE (A) JAISALMER
SPECIAL REPAIR TO BLDG NO P-1300 AND P-1301 (SM BARRACK AND TOILET BLOCK) AT FIELD REGT UNDER GE (A) JAISALMER AT MIL STATION JAISALMER
2026_MES_782052_1
84460/C/E8
Open Tender
Civil Works
Item Rate
JAISALMER
AS PER NIT
8 documents required · 8 mandatory
₹1,000
GE ARMY JAISALMER
₹1.3 L
Yes
30 Sept 2026
31 Jul 2026
5 Sept 2026
31 Jul 2026
4 Sept 2026
21 Aug 2026
31 Jul 2026 - 7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for preparation of new plastered surface and applying two coat of white or tinned with cement base paint over priming coat on exterior wall complete all as specified and directed by Engr-in-Charge. | 400 | Sqm | 99 | ₹39,600 |
| 2 | M & L for preparation of new plastered/concrete surfaces of walls, providing minumum 1mm thick Birla white wall care putty to achieve smooth surfaces and applying two coats of Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer,of
required shade and colour complete, as per manufacturer's specification. over a coat of compatiable priming paint complete all as specified. | 90 | SM | 100 | ₹9,000 |
| 3 | M&L for prepration of newly plastered surface and applying two coats of white wash on plastered surfacesof wall all as specified and directed. | 72 | SQM | 100 | ₹7,200 |
| 4 | M&L for prepration of newly plastered ceiling surface and applying two coats of white wash on plastered surface all as specified and directed. | 80 | SQM | 100 | ₹8,000 |
| 5 | Complete removal existing treatment and applying 1mm thick of Birla white wall care putty to achieve smooth surfaces and applying two coats of Oil Bound Distemper of approved shade/tint over a coat of compatiable priming paint complete all as specified and as directed. | 3,160.2 | Sqm | 100 | ₹3,16,020 |
| 6 | M&L for preparation of old plastered surfaces of ceiling and applying two coats of white wash complete all as specified and directed. | 1,553.8 | Sqm | 100 | ₹1,55,380 |
| 7 | M & L for preparation of old painted wooden surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 164.67 | Sqm | 100 | ₹16,467 |
| 8 | M&L for preparation of old painted steel surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 122.88 | Sqm | 100 | ₹12,288 |
| 9 | M&L for Chipping of slab/columns/ beams/chajjas /parapet /roof projection/ balcony/ staircase and removing loose mortar with chisel hammer without much impact on concrete surface, clean the surface by sand blasting the surface using river sand with minimum of 6 kg pressure at the nozzle or air blow by electric pressure blower by mechanical compressor, cleaning the exposed reinforcement with wire brushes etc and disposal of debris for all lead and lifts complete all as specified and directed by Engineer-in-Charge.
Note :- Scaffolding/ temporary support structure required to support the members / structure during strengthening shall be measured and paid under Ser item No.1. | 300 | Sqm | 100 | ₹30,000 |
| 10 | M&L for applying bond coat on the prepared old surface of concrete/ masonry to receive micro concrete with two coats of Sika-Latex Super SBR or equivalent make of brand & as per manufacturer specifications. Laying of reinstatement polymer mortar or micro concrete shall be completed within the overlay time of bonding coat. This bond coat act as bonding agent between old and new concrete complete all as specified and directed by Engineer-in-Charge. | 300 | Sqm | 100 | ₹30,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_876181.xls
BOQ • 0.46 MB
TENDER1.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .