| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance | L1 | Accepted-Finance Lower Rate | |
| 2 | L2₹8.6 L+₹28,357.93 (3.41%)Accepted-Finance | L2 | Accepted-Finance Higher Rate |
| Sl No | Description | Qty | Unit | SPK ENTERPRISES L2 | KARTHIK ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Material Cost:Ejector for Acid dosing line | 1 | No. | 23,550 ₹23,550 | 23,500 ₹23,500 Lowest |
| 2.00 | Labour Cost:Charges for welding of (New) lye line MS ERW pipe & ejector area acid line ( Mild steel electric resistance welded) MS ERW pipe joint for the following sizes including cost of MS welding electrodes, consumables and T & P hire charges 100NB pipe | 18 | Jts | 1,100 ₹19,800 | 1,077 ₹19,386 Lowest |
| 3.00 | Labour Cost:Charges for welding of (New) lye line MS ERW pipe & ejector area acid line ( Mild steel electric resistance welded) MS ERW pipe joint for the following sizes including cost of MS welding electrodes, consumables and T & P hire charges 80NB pipe | 56 | Jts | 900 ₹50,400 | 888 ₹49,728 Lowest |
| 4.00 | Labour Cost:Charges for welding of (New) lye line MS ERW pipe & ejector area acid line ( Mild steel electric resistance welded) MS ERW pipe joint for the following sizes including cost of MS welding electrodes, consumables and T & P hire charges 50NB pipe | 100 | Jts | 900 ₹90,000 | 888 ₹88,800 Lowest |
| 5.00 | Labour Cost:Charges for welding of (New) lye line MS ERW pipe & ejector area acid line ( Mild steel electric resistance welded) MS ERW pipe joint for the following sizes including cost of MS welding electrodes, consumables and T & P hire charges 40NB pipe | 125 | Jts | 720 ₹90,000 | 709 ₹88,625 Lowest |
| 6.00 | Labour Cost:Charges for fabrication, marking, cutting and edge preparation of spool piece as and suit to the lye pipe line and acid pipe line of ejector area as per site and inclusive of all consumables, T & P's hire charges. (M.S ERW 100 NB,80NB,50NB,40NB pipe will be supplied by TANGEDCO) 100NB pipe | 9 | Nos. | 1,500 ₹13,500 | 1,462 ₹13,158 Lowest |
| 7.00 | Labour Cost:Charges for fabrication, marking, cutting and edge preparation of spool piece as and suit to the lye pipe line and acid pipe line of ejector area as per site and inclusive of all consumables, T & P's hire charges. (M.S ERW 100 NB,80NB,50NB,40NB pipe will be supplied by TANGEDCO) 80NB pipe | 28 | Nos. | 1,500 ₹42,000 | 1,462 ₹40,936 Lowest |
| 8.00 | Labour Cost:Charges for fabrication, marking, cutting and edge preparation of spool piece as and suit to the lye pipe line and acid pipe line of ejector area as per site and inclusive of all consumables, T & P's hire charges. (M.S ERW 100 NB,80NB,50NB,40NB pipe will be supplied by TANGEDCO) 50NB pipe | 50 | Nos. | 950 ₹47,500 | 913 ₹45,650 Lowest |
| 9.00 | Labour Cost:Charges for fabrication, marking, cutting and edge preparation of spool piece as and suit to the lye pipe line and acid pipe line of ejector area as per site and inclusive of all consumables, T & P's hire charges. (M.S ERW 100 NB,80NB,50NB,40NB pipe will be supplied by TANGEDCO) 40NB pipe | 63 | Nos. | 750 ₹47,250 | 730 ₹45,990 Lowest |
| 10.00 | Labour Cost:Charges for dismantling and erection of (New) MSRL pipe with flanges in lye filling, drawel & unloading line area and acid line in ejector area, including cost of consumables and hire charges for T&P's. 100NB MSRL pipe | 18 | Mtr. | 1,100 ₹19,800 | 1,079 ₹19,422 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
4 Aug 2025, 2:00 pmClosed
The Chief Engineer
The Chief Engineer, North Chennai Thermal Power Station - I, Chennai - 120
NCTPS I Operation Circle CAD DM and RO Plant Dismantling the existing leak deteriorated of lye pump suction line Mild steel rubber line lye filling MSRL pipe line from unloading pump to lye storage tank lye drawl MSRL pipe line from lye storage tank
2025_EB_583947_1
CE/NCTPS-I/SE/OPN/33/2025-26
Open Tender
Power/Energy Projects/Products
Works
60 days
NCTPS - I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,500
Yes
9 Sept 2025
21 Jul 2025
5 Aug 2025
21 Jul 2025
4 Aug 2025
21 Jul 2025
Amount
Material Cost:Ejector for Acid dosing line
Labour Cost:Charges for welding of (New) lye line MS ERW pipe & ejector area acid line ( Mild steel electric resistance welded) MS ERW pipe joint for the following sizes including cost of MS welding electrodes, consumables and T & P hire charges 100NB pipe
Labour Cost:Charges for welding of (New) lye line MS ERW pipe & ejector area acid line ( Mild steel electric resistance welded) MS ERW pipe joint for the following sizes including cost of MS welding electrodes, consumables and T & P hire charges 80NB pipe
Labour Cost:Charges for welding of (New) lye line MS ERW pipe & ejector area acid line ( Mild steel electric resistance welded) MS ERW pipe joint for the following sizes including cost of MS welding electrodes, consumables and T & P hire charges 50NB pipe
Labour Cost:Charges for welding of (New) lye line MS ERW pipe & ejector area acid line ( Mild steel electric resistance welded) MS ERW pipe joint for the following sizes including cost of MS welding electrodes, consumables and T & P hire charges 40NB pipe
Labour Cost:Charges for fabrication, marking, cutting and edge preparation of spool piece as and suit to the lye pipe line and acid pipe line of ejector area as per site and inclusive of all consumables, T & P's hire charges. (M.S ERW 100 NB,80NB,50NB,40NB pipe will be supplied by TANGEDCO) 100NB pipe
Labour Cost:Charges for fabrication, marking, cutting and edge preparation of spool piece as and suit to the lye pipe line and acid pipe line of ejector area as per site and inclusive of all consumables, T & P's hire charges. (M.S ERW 100 NB,80NB,50NB,40NB pipe will be supplied by TANGEDCO) 80NB pipe
Labour Cost:Charges for fabrication, marking, cutting and edge preparation of spool piece as and suit to the lye pipe line and acid pipe line of ejector area as per site and inclusive of all consumables, T & P's hire charges. (M.S ERW 100 NB,80NB,50NB,40NB pipe will be supplied by TANGEDCO) 50NB pipe
Labour Cost:Charges for fabrication, marking, cutting and edge preparation of spool piece as and suit to the lye pipe line and acid pipe line of ejector area as per site and inclusive of all consumables, T & P's hire charges. (M.S ERW 100 NB,80NB,50NB,40NB pipe will be supplied by TANGEDCO) 40NB pipe
Labour Cost:Charges for dismantling and erection of (New) MSRL pipe with flanges in lye filling, drawel & unloading line area and acid line in ejector area, including cost of consumables and hire charges for T&P's. 100NB MSRL pipe
Labour Cost:Charges for dismantling and erection of (New) MSRL pipe with flanges in lye filling, drawel & unloading line area and acid line in ejector area, including cost of consumables and hire charges for T&P's. 80NB MSRL pipe
Labour Cost:Charges for dismantling and erection of (New) MSRL pipe with flanges in lye filling, drawel & unloading line area and acid line in ejector area, including cost of consumables and hire charges for T&P's. 50NB MSRL pipe
Labour Cost:Charges for dismantling and erection of (New) MSRL pipe with flanges in lye filling, drawel & unloading line area and acid line in ejector area, including cost of consumables and hire charges for T&P's. 40NB MSRL pipe
Labour Cost:Charges for transporting of 1 No pipe / fitting from the working area to outside rubber lining area and return back to NCTPS-I site area. (M.S ERW 100 NB, 80NB,50NB,40NB pipe will be supplied by TANGEDCO) 100NB pipe
Labour Cost:Charges for transporting of 1 No pipe / fitting from the working area to outside rubber lining area and return back to NCTPS-I site area. (M.S ERW 100 NB, 80NB,50NB,40NB pipe will be supplied by TANGEDCO) 80NB pipe
Labour Cost:Charges for transporting of 1 No pipe / fitting from the working area to outside rubber lining area and return back to NCTPS-I site area. (M.S ERW 100 NB, 80NB,50NB,40NB pipe will be supplied by TANGEDCO) 50NB pipe
Labour Cost:Charges for transporting of 1 No pipe / fitting from the working area to outside rubber lining area and return back to NCTPS-I site area. (M.S ERW 100 NB, 80NB,50NB,40NB pipe will be supplied by TANGEDCO) 40NB pipe
Labour Cost:Charges for providing of new rubber lining, sand blasting, dismantling the internals, Coating of adhesive compound providing 8 hours gap between each coating before patching of natural rubber, rubber lining(Vulcanizing) by hot banding process of the (New) MS ERW pipe with flanges of lye line and acid line in ejector area , inclusive of T & Ps and consumables)
Labour Cost:Charges for Painting the (New) MS ERW pipe with flanges of lye line and acid line in ejector area with one coat of Redoxide and two coats of Enamel paint after thorough scrapping with emery sheet with manual labour and as per the direction and satisfaction of the Engineer in charge, the rate including the cost of paint, inclusive of T & Ps and consumables)
SPK ENTERPRISES (BID ID -1419002)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .