Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | ₹16.8 L | L1 | Accepted-AOC OK |
| 2 | L2₹16.9 LRejected-Finance | ₹16.9 L | L2 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | BALAGURU INFRA L1 | K NANDAKUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in narrow trenches for drain work and depositing on bank with initial lead of 10m and lift of 2m in hard red earth shales murams gravel mixed with small size boulders and hard gravelly soil complying with standard specification (TNDSS No.23, 24) | 318 | M3 | 230 ₹73,138.85 | 240 ₹76,318.80 |
| 2.00 | Plain Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 21 | M3 | 5,601 ₹1.2 L | 5,610 ₹1.2 L |
| 3.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 2.10 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton and as directed by the departmental Officers(Payment for centering shall be given after the concrete is laid) | |||||
| 3.01 | Drain ( without strutting) | 901 | M2 | 563 ₹5.1 L | 570 ₹5.1 L |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 145 | M3 | 6,763 ₹9.8 L | 6,800 ₹9.9 L |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
2 Mar 2026, 3:00 pmClosed
THE COMMISSIONER,ERODE CITY MUNICIPAL CORPORATION
246, MEENAKSHI SUNDARANAR SALAI, ERODE
Construction of Storm water drain at Rajiuv nagar Last cross street in ward no. 2
2026_MAWS_668858_1
E1-0118-2025-1-1-6-ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
60 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
1 document required · 1 mandatory
₹7,080
₹20,000
26 May 2026
2 Mar 2026
2 Mar 2026
2 Mar 2026
2 Mar 2026
2 Mar 2026
Earth work excavation in narrow trenches for drain work and depositing on bank with initial lead of 10m and lift of 2m in hard red earth shales murams gravel mixed with small size boulders and hard gravelly soil complying with standard specification (TNDSS No.23, 24)
Plain Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 2.10 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton and as directed by the departmental Officers(Payment for centering shall be given after the concrete is laid)
Drain ( without strutting)
Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_803617.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid