Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹3.7 Cr
EMD Value
₹20.5 L
Closing Date
23 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Under road safety, road safety work such as installing crash barriers, table tops, cat eyes, rumble strips, and signboards on the NH-3 Dignagar Canal Bank to Gutila Gangrau Road (A.Ji.Ma.) in Agra district
2026_CEAGR_1126619_1
735/14M-AC/2025-26 dated 05-02-2026
Open Tender
Civil Works
Percentage
150 days
Agra
Under road safety
2 documents required · 2 mandatory
₹2,360
₹20.5 L
Yes
Agra
6 Apr 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 1,375 | Cum. | 175 | ₹2,40,625 |
| - | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 365 | Cum. | 180 | ₹65,700 |
| - | Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. As per MoRT&H clause 401(b). | 70 | Cum. | 3,100 | ₹2,17,000 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406. | 105 | Cum. | 3,140 | ₹3,29,700 |
| - | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.6 kg/sqm using mechanical means. | 460 | Sqm | 39.5 | ₹18,170 |
| - | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with Machenical control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.. Grading-II | 34 | Cum. | 10,000 | ₹3,40,000 |
| - | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sum on the prepared bituminous surface cleaned with mechanical broom. | 525 | Sqm | 11 | ₹5,775 |
| - | Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 % of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with Machenical Control to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 509 complete all respects. Grading-II | 36 | Cum. | 11,000 | ₹3,96,000 |
| - | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 275 | Cum. | 135 | ₹37,125 |
| - | Plain Cement Concrete M15 in Open Foundation complete as per Drawing and Technical Specifications. | 20 | Cum. | 6,500 | ₹1,30,000 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.51 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
T2DIGNERNEHERPATRI.pdf
Tender Documents • 4.49 MB
BOQ_2101013.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .