| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25 LAccepted-AOC | ₹25 L Quoted ₹94.5 L | L1 | Accepted-AOC Seven no bidder found L1 so total contract value divide between 7 bidder |
| 2 | L1₹25 LAccepted-AOC | ₹25 L Quoted ₹94.5 L | L1 | Accepted-AOC Seven no bidder found L1 so total contract value divide between 7 bidder |
| 3 | L1₹25 LAccepted-AOC | ₹25 L Quoted ₹94.5 L | L1 | Accepted-AOC Seven no bidder found L1 so total contract value divide between 7 bidder |
| 4 | L1₹25 LAccepted-AOC | ₹25 L Quoted ₹94.5 L | L1 | Accepted-AOC Seven no bidder found L1 so total contract value divide between 7 bidder |
| 5 | L1₹25 LAccepted-AOC NEAR JANTA COLLEGE ANANTPUR REWA DISTT REWA M P 486001 | REWA | MADHYA PRADESH | 486001 | ₹25 L Quoted ₹94.5 L | L1 | Accepted-AOC Seven no bidder found L1 so total contract value divide between 7 bidder |
Tender Value
₹2 Cr
EMD Value
₹1 L
Closing Date
6 Nov 2019, 5:30 pmClosed
collector Rewa
office of collector dis rewa
ERECTION TESTING COMMISSIO NING OF NEW LT 11 KV LINES DISTRIBUTION SUBSTATIONS ON TURNKEY BASIS IN RURLA URBAN AREAS OF REWA DISTRICT UNDER ONM CIRCLE REWA
2019_PKVVC_53490_2
No 53-10/05/TS/4698
Open Tender
Electrical Works
Item Wise
365 days
Distric Rewa
as per nit
7 documents required · 7 mandatory
₹5,600
Yes
ONLINE
₹1 L
Yes
12 Feb 2020
23 Oct 2019
13 Nov 2019
23 Oct 2019
6 Nov 2019
23 Oct 2019
Amount
11 KV line on 152x152 mm 37.1 Kg/Mtr. 13 mtr. Long H-Beam with Raccon conductor (C-1.1)
11 KV line on 8 mtr. 140 Kg long PCC pole with Rabbit conductor (C-1.2)
11 KV line on RSJ using Rabbit Conductor (C-1.3)
11 KV DP Structure on 8 Mtr 140 Kg long PCC pole for straight line (C-5.1)
11 KV DP Structure on 8 Mtr 140 Kg long PCC pole for tapping (C-5.2)
11 KV DP structure on 152x152 mm 37.1 Kg/Mr 13 mtr long H beam with (single circuit)( C- 6.1)
11 KV DP structure on 152x152 mm 37.1 Kg/Mtr 11 mtr long H beam with (single circuit)( C- 6.2)
11 KV DP structure on 152x152 mm 37.1 Kg/Mtr 13 mtr long H beam ( C- 6.5)
Installation of 11/0.4 KV outdoor type sub-station as per schedule – E-1.2, 1.3, 1.4) (i) 25 KVA
(ii) 63 KVA
(iii) 100 KVA
Installation of 11/0.4 KV outdoor type sub-station as per schedule – E-2.1, 2.2, 2.3) (i) 63 KVA
(ii) 100 KVA
(iii) 200 KVA
Installation of 11/0.4 KV outdoor type sub-station as per schedule – E-3.1, 3.2, 3.3) (i) 63 KVA
(ii) 100 KVA
(iii) 200 KVA
LT line (A) 3 phase 5 wire line on RSJ -
(i) Using ab XLPE 3x95 sq. mm cable span max. 50 mtr. schedule (D-1.1)
(ii) Using AB XLPE 3x70 sq. mm cable span max. 50 mtr. schedule (D-1.4)
(iii) Using AB XLPE 3x50 sq. mm cable span max. 50 mtr. schedule (D-1.3)
(iv) Using AB XLPE 3x35 sq. mm cable span max. 50 mtr. schedule (D-1.2)
(v) Using AB XLPE 3x25 sq. mm cable span max. 50 mtr. schedule (D-1.1)
(i) Using AB XLPE 3x50 sq. mm cable span max. 50 mtr. schedule (D-2.4)
(ii) Using AB XLPE 3x35 sq. mm cable span max. 50 mtr. schedule (D-2.3)
(ii) Using AB XLPE 3x25 sq. mm cable span max. 50 mtr. schedule (D-2.2)
(C) LT line 1 phase 3 wire me PCC support using AB XLPE cable with max. span of 67 mtr. -
(i) Using AB XLPE 2x35 sq. mm cable span max. 67 mtr. schedule (D-3.1)
(ii) Using AB XLPE 2x25 sq. mm cable span max. 67 mtr. schedule (D-3.2)
SHUKLA ENTERPRISES
RAMESH PRATAP SINGH
PIYUSH DWIDEDI
RAMESH KUMAR TIWARI
SANJEEV KUMAR DWIVEDI
SANDEEP KUMAR TIWARI
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .