| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹3.5 L | L1 | Accepted-AOC Lower Quoted Rates |
| 2 | L2₹3.6 LRejected-Finance P O DHUSSARA TEHSIL AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹3.6 L | L2 | Rejected-Finance Higher Quoted rates |
| 3 | L2₹3.6 LRejected-Finance SANTOKHGARH DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹3.6 L | L2 | Rejected-Finance Higher Quoted rates |
Updated dates
Tender Value
Refer Docs
EMD Value
₹3,314
Closing Date
7 Jan 2026, 5:00 pmClosed
Sr. Executive Engineer
Sr. Executive Engineer, Electrical Division Gagret
Tender for Prov. and erection/Re-Organization of existing 11 KV HT line (Gagret-Bharwain Feeder) for construction of working women hostel under SASCI at Mubarikpur on Partial tunkey basis in electrical section Mubarikpur under ESD, HPSEBL, Mubarikpur
2025_HPSEB_124655_1
GED-161/2025-26
Open Tender
Electrical Works
90 days
Mubarikpur
Please refer Tender Document
2 documents required · 2 mandatory
₹590
₹3,314
2 Apr 2026
29 Dec 2025
8 Jan 2026
29 Dec 2025
7 Jan 2026
29 Dec 2025
Erection of new Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of S.T Tripple Pole 9 Mtr. Long for Tapping Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and Sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/4.26 (100 mm2) Conductor of 11 KV HT line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Dismentalling of existing HT conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing and hand over to the Junior Engineer En-Charge complete in all respect
Dismentalling of existing HT Poles and hand over to the Junior Engineer En-Charge complete in all respect.
Prov. Conductor 7/4.26 (100 mm2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}
Prov. Steel Tubular Poles (9 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro' and 3 No. Double Pole Dead End Structures)
Prov. RCC Muffs with concerete filling
Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length (1270) mm i/c tolerance of 100 mm either sider) x 8 structure.
Prov. Angle Iron (50x50x6 mm), Length (750 mm x 2 x 8 structures
Prov. Pole Top Bracket [MSCI: 100x50x6 mm 100 mm)
Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (6 Nos Supply by HPSEBL)
Prov. Belt Set - MS Angle Iron: 50x50x6, Length 1800 mm x 2 No.
Prov. X-Bracing Set - MS Angle Iron: 50x50x6, Length 2125 mm x 2 No.
Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x5, Length 2340x2 mm x 2 No. formation.
Prov. Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)
Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure (9 Nos Supply by HPSEBL)
Prov. Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures)
Prov. Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) (72 Kg Supply by HPSEBL)
Prov. HT Earthing set complete (REC constr. Stand J-1)
Prov. Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m (35 Kg Supply by HPSEBL)
Prov. Eye Hook for earth wire
Prov. Earth Reel
Prov. Half Clamp [on double pole dead end str. 4 Nos.on run through str. 2 Nos.]
Prov. Full Clamp (on double pole dead end str. 4 Nos.) single pole on run through str. 2 Nos.
Prov. Danger Plate (250X200X1.6 mm) (3 Nos Supply by HPSEBL)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Barbed Wire
Prov. Red Oxide
Prov. Aluminium Paint
Transporation and Loading of HT Line materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage of HT Line and allied Material For Average Distance From Road To Site Of Work .(If required as per site).
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
B.rar
Tender Documents • 0.48 MB
BOQ_183245.xls
BOQ • 1.18 MB
Spc.pdf
Additional Documents • 6.24 MB
Download all tender documents and submit your bid