Loading…
Loading…
Tender ID
Tender Value
₹24.5 L
EMD Value
₹49,020
Closing Date
7 Apr 2026, 6:00 pmClosed
EO NP Dhariyawad
Office of the EO NP Dhariyawad
17 - Goashala ki Chardiwari Vistaar karya Dhariyawad.
2026_DLB_548727_17
NIT No 100/2025-26 NP Dhariyawad
Open Tender
Civil Works
Percentage
DHARIYAWAD
As per given in NIT and Conditions
3 documents required · 3 mandatory
₹1,000
As per NIT and Conditions
₹49,020
Yes
27 Mar 2026
27 Mar 2026
9 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1As Per RUIDP SOR 2023 | |||||
| 2Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground /Road top level. In all types soild/saturated soil such as moorum, sand, sandy silt, black cotton soil, kankar, etc Depth upto 1.5 m (RUIDP SOR 2023 ITEM NO. 4.10.1.1) | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size) (RUIDP SOR 2023 ITEM NO. 21.1.7) | |||||
| 4Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) (RUIDP SOR 2023 ITEM NO. 25.1.1) | |||||
| 5Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). (RUIDP SOR 2023 ITEM NO. 23.1.2) | |||||
| 6Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : | |||||
| 7Lintels, beams, plinth beams, girders, bressumers and cantilevers.(RUIDP SOR 2023 ITEM NO. 22.1.5) | |||||
| 8Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. (RUIDP SOR 2023 ITEM NO. 23.19.6) | |||||
| 9Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) (RUIDP SOR 2023 ITEM NO. 24.5.1) | |||||
| 10Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand) (RUIDP SOR 2023 ITEM NO. 32.3.3) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
Tendernotice_2.pdf
PDF • 22.42 MB
BOQ_978337.xls
BOQ • 0.29 MB
Corrigendum.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .