Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹9,980
Closing Date
27 Jun 2026, 2:00 pm7d left
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER (GRWW)
KOLKATA MUNICIPAL CORPORATION OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
RENOVATION OF DAMAGED ROTATING ASSEMBLY OF PUMP UNIT NO. 3 ALONG WITH REPLACEMENT, FITTING- FIXING, TESTING AND COMMISSIONING OF THE SAME AT CWPS-II, GRWW.
2026_KMC_1028047_1
KMC/EE/WS/GRWW/25-26/PH-II/55R
Open Tender
MECHANICAL
15 days
CWPS-II OF GARDEN REACH WATER WORKS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,980
17 Jun 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
27 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | DISMANTLING OF NUT & BOLT WASHER ETC OF TOP COVER
FROM LOWER HALF CASING OF PUMP AND KEPT IT SUITABLE PLACE AS PER DIRECTION OF THE EIC. | 1 | ITEM | - | - | itemH1Code1 |
| 2 | DISMANTLING THE BEARING HOUSING AT BOTH END &
DECOUPLING BOTH FROM PUMP MOTOR UNIT AND LIFTING THE TOTAL ROTATING ASSEMBLY & KEEP IT AT A SUITABLE PLACE AS PER DIRECTION OF THE EIC. | 1 | ITEM | - | - | code1.02 |
| 3 | DISMANTLING THE ALL PART OF THE ROTATING ASSEMBLY
ONE BY ONE SUCH AS COUPLING UNIT OF PUMP SIDE &
BEARING, SLEEVE, SLEEVE NUT AT BOTH END ETC.INCLUDING TO AND FRO TRANSPORTATION, LOADING, UNLOADING ETC. AS PER DIRECTION OF THE EIC. | 1 | ITEM | - | - | itemH1Code2 |
| 4 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITH
NECESSARY MACHINING & FINISHING OF SHAFT SLEEVE
MADE OF SS 410 IN RESPECT OF THE ROTATING ASSEMBLY
AS PER SAMPLE AND DIRECTION OF THE EIC. | 2 | NUMBER | - | - | itemH1Code3 |
| 5 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITH
NECESSARY MACHINING & FINISHING OF BUSH FOR
COUPLING OF PUMP-MOTOR MADE OF NEOPRENE RUBBER IN RESPECT OF THE ROTATING ASSEMBLY AS PER SAMPLE AND DIRECTION OF EIC. | 8 | NUMBER | - | - | itemH1Code4 |
| 6 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITH
NECESSARY MACHINING & FINISHING OF COUPLING BOLT
WITH NUT MADE OF HT STEEL IN RESPECT OF THE ROTATING ASSEMBLY AS PER SAMPLE AND DIRECTION OF EIC. | 8 | NUMBER | - | - | itemH1Code5 |
| 7 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITH
NECESSARY MACHINING & FINISHING OF NUT, BOLT &
WASHER FOR TOP & BOTTOM CASING MADE OF HT STEEL AS PER SAMPLE AND DIRECTION OF EIC. | 10 | NUMBER | - | - | itemH2Code6 |
| 8 | Supply and delivery of the following bearing (Make: SKF):NU322ECM | 1 | EACH | - | - | itemH2Code7 |
| 9 | SUPPLY, DELIVERY, FITTING AND FIXING OF SKF MAKE
BEARING NO 7322 BECBM FOR 24UPH3 PUMP AT CWPS-II,
GRWW. | 2 | EACH | - | - | itemH2Code8 |
| 10 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITH
NECESSARY MACHINING & FINISHING OF SLEEVE NUT/JAM
NUT MADE OF SS 410 IN RESPECT OF THE ROTATING
ASSEMBLY AS PER SAMPLE AND DIRECTION OF EIC. | 4 | NUMBER | - | - | itemH2Code9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
TechnicalBid55R.pdf
Tender Documents • 0.43 MB
OIDBID.pdf
Additional Documents • 0.32 MB
BOQ_2525263.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid