| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance | ₹2.2 Cr | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹2.3 Cr+₹12.8 L (5.94%)Rejected-Finance | ₹2.3 Cr+₹12.8 L (5.94%) | L2 | Rejected-Finance Not Lowest bidder |
| 3 | L3₹2.3 Cr+₹15.2 L (7.05%)Rejected-Finance | ₹2.3 Cr+₹15.2 L (7.05%) | L3 | Rejected-Finance Not Lowest bidder |
| 4 | L4₹2.4 Cr+₹25.2 L (11.7%)Rejected-Finance | ₹2.4 Cr+₹25.2 L (11.7%) | L4 | Rejected-Finance Not Lowest bidder |
| 5 | L5₹2.6 Cr+₹48.4 L (22.4%)Rejected-Finance | ₹2.6 Cr+₹48.4 L (22.4%) | L5 | Rejected-Finance Not Lowest bidder |
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
27 Dec 2023, 6:00 pmClosed
Senior Manager civil
DGM office, Kalaburagi Airport, Kalaburagi
Raising of Operational Boundary Wall as per BCAS Standard and Reconstruction of Boundary Wall in Damaged Portions at Kalaburagi Airport
2023_AAI_178143_1
AAI/KAL/ENGG(C)/WALL/23-24
Open Tender
Civil Works
Item Rate
180 days
Kalaburagi Airport
As per NIT
10 documents required · 10 mandatory
₹1,180
₹6.2 L
Yes
25 Jan 2024
16 Dec 2023
29 Dec 2023
16 Dec 2023
27 Dec 2023
20 Dec 2023
16 Dec 2023 - 20 Dec 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix: 1:6 (1 cement: 6 coarse sand)
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
Providing and erecting 2.40 metre high temporary barricading at site; each panel of size 3.0mx2.40m made of 80x40x4mm hollow MS tube posts and 50x50x3mm horizontal members/bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so that overall height to be of 2.40m. Suitable arrangement shall be made to fix the barricading to avoid from overturning by grouting the post in rich concrete block of size 0.4x0.4x0.5m. The work shall be executed as per drawing/direction of Engineer-in-Charge The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work).
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and submitting the structural design and drawing of operational boundary wall including foundation details for the proposed strcture, after carrying out necessary soil investigation. The structural design and drawings goods for construction shall be done by a structural consultant appointed by Contractor. The contractor shall submit the soil test report, structural design and drawing to Engineer-in-charge after vetting from NIT/IIT/Govt Engineering College. If any clarification/alteration in design is required by the Engineer-in-charge, the same be done without any additional cost. The contractor shall submit Two sets of structure design calculation & six sets of structural drawings showing all relevant details required for execution of work, duly vetted by NIT/IIT/ Govt Engineering College. Note : The contractor shall appoint the consultant for soil testing and structural design with prior approval of Enginner-in-charge. The soil investigation shall be carried out as per the prevailing AAI guidelines direction of Engineer-in-charge.
Dismantling and taking away of Existing RR Boundary wall as directed by Engineer in charge including disposal of rubbish beyond AAI premises.
Cat (B) - Buy Back Items
Buy-Back (ie minus) : Dismantling and taking away of Existing barbed wire and concertina coil fencing on Boundary wall as directed by Engineer in charge including disposal of rubbish beyond AAI premises.
Buy-Back (ie minus): Dismantling and taking away of MS angles over Boundary wall as directed by Engineer in charge including disposal of rubbish beyond AAI premises
R ENGINEERING
VIJAYKUMAR CHAVAN
Srinivas Gannamaneni
Vasishtha Power Infra
RSR INFRA WORKS (INDIA) PVT. LTD.,
Classicon Projects India Pvt. Ltd.
K.SREENIVASA REDDY & CO
KVR Construction Heights Pvt Ltd
SINGADE CONSTRUCTIONS & INFRASTRUCTURE PRIVATE LIMITED
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .