Loading…
Loading…
Tender Value
₹9.3 L
EMD Value
₹19,000
Closing Date
7 Aug 2026, 2:00 pm6d left
Executive Engineer-III (DP) ,DNH,Silvassa
Executive Engineer-III (DP) ,DNH,Silvassa
Construction of Toilet Block at Primary School Haldunpada Silly DNH
2026_UTDNH_8191_1
E TENDER NOTICE NUMBER 11 OF 2026-2027 (DP)
Open Tender
Civil Works
Item Rate
60 days
UT of DNH
refer tender document
4 documents required · 4 mandatory
₹500
Executive Engineer-III (DP) ,DNH,Silvassa
₹19,000
31 Jul 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation up to 1.50 mt. depth including sorting out and stacking of use ful materials and disposing off the excavated stuff up to 50 meter lead (A) Loose or soft soil. | 54.71 | One Cubic Meter | 1.25 | ₹68.39 |
| 2 | Excavation for foundation up to 1.50 mt. to 3.00 mt. depth including sorting out and stacking of use ful materials and disposing off the excavated stuff up to 50 meter lead (A) Loose or soft soil. | 22.26 | One Cubic Meter | - | - |
| 3 | Filling available excavated earth (excluding rock) in tranches plinth, sides of foundation, etc. in layers not exceeding 20 cm in depth. Consolidating each deposited layer by ramming and watering. | 25.65 | One Cubic Meter | -1.25 | - |
| 4 | Providing Material and Labour for filling in Foundation and Plinth with gravel including consolidating deposited layers by ramming watering etc. complete. | 6.58 | One Cubic Meter | -2.5 | - |
| 5 | Providing and filling rubbles including hand packing and filling interstices with quarry spalls behind abutments and between returns as directed. | 16.03 | One Cubic Meter | -3.75 | - |
| 6 | Providing and laying cement concrete 1:2:4 (1-Cement :3-Coarse sand :6-graded stone aggregates 20mm nominal size) and curing complete including cost of formwork in (A) Foundation and Plinth (more than 10 ton). | 15.31 | One Cubic Meter | -5 | - |
| 7 | Providing and laying controlled cement concrete M-200 and curing complete excluding the cost of from work and reinforcement for reinforced concrete work in (A) Foundation, footings, Base of columns and Mass concrete. | 4.95 | One Cubic Meter | -6.25 | - |
| 8 | Providing and laying controlled cement concrete M-200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for RCC work in (B) COLUMNS (i) Having cross-sectional area 0.05 to 0.08 Sq.m. | 1.74 | One Cubic Meter | -7.5 | - |
| 9 | Providing and laying controlled cement concrete M-200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for RCC work in (A) BEAMS (ii) Having cross-sectional area 0.08Sq.M and upto 0.12 Sq.M. | 4.72 | One Cubic Meter | -8.75 | - |
| 10 | Providing and laying controlled cement concrete M-200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for RCC work in (A) BEAMS (ii) Having cross-sectional area more than 0.05Sq.M to 0.08 Sq.M. | 0.86 | One Cubic Meter | -10 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_8378.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].