Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹4.6 LAccepted-AOC | Ist | Accepted-AOC L1 | |
| 2 | IInd₹6.0 LRejected-AOC UTTAR PRADESH | IInd | Rejected-AOC L2 | |
| 3 | IIIrd₹6.0 LRejected-AOC 16F 1K NEW MARKET BAMRAULI NEAR BAMRAULI RAILWAY STATION ALLAHABAD UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | IIIrd | Rejected-AOC L3 |
Tender Value
₹5.7 L
EMD Value
₹6,000
Closing Date
23 Dec 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
90-ETC-I(A)/ 2021-2022
2021_UPTCL_653843_1
90-ETC-I(A)/ 2021-2022
Open Tender
Electrical Works
Item Rate
60 days
Sarangapur Phulpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE,ETC,PRAYAGRAJ
₹6,000
22 Feb 2022
10 Dec 2021
24 Dec 2021
10 Dec 2021
23 Dec 2021
10 Dec 2021
120 days
Amount
Revetment of tower location No. 28(A+0) of 220 KV S/C Sarangapur (PG)- Phulpur transmission line under Electy. Trans. Division-I, Prayagraj. The job includes the following works :-
Excavation of ordinary soil for reventment wall including cost of all labour and T&P etc.
Laying of bottom pad (lean concreting) in thickness of 50mm in ratio of 1:3:6 of cement, sand and 40mm stone ballast including cost of all material and labour.
Making of plateform in thickness of 0.25 Mtr. In ratio of 1:4:8 of cement, sand and 40mm stone ballast including cost of all material and labour.
1st class massonry work with brick with 1:5 cement, coarse sand of mortar for construction of revettement wall including the cost of all material and labour.
Cement concrete with 20mm stone ballast, coarse sand and cement in ratio of 1:2:4 on the top plateform of the foundation including all material, labour and T&P etc required for completion of work satisfactory as per tech spec & drawing for top cover construction including cost of all material and labour charge.
Earthfilling under floor and in area for the revetment of the towers including the cost of earth to be obtained from outside including watering, ramming in 200mm layers and dressing of earth etc complete including the cost of earth royalty, taxes, skilled labour and T&P including all leads as per technical specification.
Making weep holes providing plastic pipe of length 30 mtr. (cost including the cost of plastic pipe including cutting in accordance size and fitting them in two layers at the span of 2.0 mtr. at depth of 0.5 mtr., 1.25 mtr. and 2.0 mtr. respectively from the top of the revettement wall ).
NEELAM ENTERPRISES
R.S.ASSOCIATE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .