Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹36.2 L+₹54,912 (1.54%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L2 | Rejected-Finance HIGHER BIDDE | |
| 3 | L3₹38.3 L+₹2.6 L (7.37%)Rejected-Finance NH 17 MAIN ROAD BINAGA BAZAR KARWAR 581307 | KARWAR | UTTARA KANNADA | KARNATAKA | 581307 | L3 | Rejected-Finance HIGHER BIDDER |
Tender Value
₹38.7 L
EMD Value
₹77,400
Closing Date
17 Feb 2020, 6:00 pmClosed
SH M V SANKAR SE
CWE NAVY VASCO VASCO DA GAMA GOA 403802
MANNING AND OPERATION OF LIFTS MAP QTRS AT ARGA AND LITTLE BINAGA AT NAVAL BASE KARWAR UNDER GE SB KARWAR
2020_MES_315481_1
85221/E8
Open Tender
Civil Works
Item Rate
334 days
CWE NAVY VASCO
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹500
Yes
GE SB KARWAR
₹77,400
Yes
3 Mar 2020
16 Jan 2020
19 Feb 2020
16 Jan 2020
17 Feb 2020
3 Feb 2020
Amount
Notes for Item Nos 1 & 2:- (a) The Contractor shall Employ General mechanic/Electrician/FGM having minimum ITI qualification from Govt Recognised institute with adequate knowledge & minimum 2 years experience in maint/operation of lift installations. The operator must competent to carry out the minor maint all as directed. Total number of operators required per day are 12 nos (b) Contractor shall pay the wages to the employees through e-payment i.e Adhaar linked bank accounts (credit to their bank account). Engineer-in-charge shall ensure that e-payment made to employees and their wages shall not be less than minimum wages fixed by state Govt or Central Govt whichever is more. Monthly e-banking statement shall be furnished by the contractor to the Engineer-in-Charge and the same shall be kept in record duly verified.
(c) It is the responsibility of contractor to deposit the employees provident fund (EPF) to the concerned authority as per the prevaling scales as laid down by Ministry of labour for all operator/helper (as applicable) and necessary proof to this regard shall be submitted to the Engineer-in-charge for verification & record. The quoted rates shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, the same shall be recovered from his dues as per the prevailing scale plus 15 percent. (d) The contractor shall maintain all the registers under various labour law rules, 2017 and shall be produced to the Engineer-in-Charge as well as officers detailed by central labour department. (e) Each shift duration shall be 8 hours & duty timing shall be decided by Engineer-in-Charge. (f) The unit rate quoted shall deemed to be included for cost of labour for daily routine maintenance for trouble free functioning of installation. (g) In case of any abnormal noise/ complaint the plant should be put off and same should be brought to the notice of Engineer-in-charge.
h) The operator employed by the contractor shall be capable of carrying out minor repair/ maintenance & should have well experience in lift installation as applicable. (j) The quoted rate is deemed to be inclusive of cotton waste, cleaning material etc & Contractor shall ensure general area cleanliness and upkeep of the installation on daily basis. (k) The quoted rate is deemed to be inclusive of tools & testing instruments required for operation & maintenance of lift installation. (l) The rate quoted shall deemed to be inclusive of safety gear & required tools for minor maintenance. In case of failure to provide tools kit & safety kit (spanner sets, hand gloves), a penalty of Rs 3000/- shall be recovered and levied (m) The Contractor shall not employ same tradesman continuously for more than 11 months during the Contract period.
(n) The contractor shall provide 02 uniforms to each operator and design of uniform shall be got approved. In case of failure, a penalty of Rs 100/- per person per shift will be levied and recovered from their dues. (o) In case of failure due to absence of operative staff, the contractor shall be liable to pay compensation at twice the cost of a day’s Manning & Operation derived from pro rata rate of Sch ‘A’ quoted rates. (p) The Contractor shall maintain proper records of all kinds of daily, weekly, monthly, quarterly, half yearly and yearly or whatsoever maint is carried out during contract period in a binded book / register and shall obtain the signature of Engineer-in-Charge every fortnightly. (q) The contractor shall provide board at proper location near each installations duly writing the name of operators and Mobile Numbers shiftwise. (r) Contractor shall display the lift safety precautions as per Appendix ‘B’ enclosed as serial page Nos.119 & 120 are enclosed herewith and as directed by the Engineer-in-Charge.
Escon Elevators Pvt Ltd
ANKIT SHIP REPAIRERS AND SUPPLIERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .