| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 CrAdmitted-Finance | ₹13.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹19.0 Cr+₹5.7 Cr (42.4%)Admitted-Finance | ₹19.0 Cr+₹5.7 Cr (42.4%) | L2 | Admitted-Finance |
| 3 | L3₹19.2 Cr+₹5.9 Cr (44.5%)Admitted-Finance | ₹19.2 Cr+₹5.9 Cr (44.5%) | L3 | Admitted-Finance |
| 4 | L4₹19.8 Cr+₹6.5 Cr (49.0%)Admitted-Finance | ₹19.8 Cr+₹6.5 Cr (49.0%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Mira Construction L3 | D B INFRATECH L2 | M/s Piyush enterprises L1 | M.S.ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00Items : | |||||||
| 1.01 | Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. work | 54.03 | Cu.M | 1,72,896 ₹1,72,896 | 1,51,284 ₹1,51,284 | 1,07,951.94 ₹1,07,951.94 Lowest | 1,51,284 ₹1,51,284 |
| 1.02 | Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.
(ii) In Cement Mortar. | 250 | Cu.M | 2,28,250 ₹2,28,250 | 2,12,500 ₹2,12,500 | 2,12,500 ₹2,12,500 | 1,87,500 ₹1,87,500 Lowest |
| 1.03 | Dismentling steel work including distempering and stacking the materials with all lead and lift. | 500 | Kg | 23,500 ₹23,500 | 17,000 ₹17,000 | 9,000 ₹9,000 Lowest | 23,500 ₹23,500 |
| 1.04 | Providing and fixing dowel bars of minimum 32mm dia. for anchoring by drilling holes in foundation strata including necessary bending, hooking of dowel bars and grouting the holes complete as per detailed drawing and as directed. | 150 | M | 3,24,450 ₹3,24,450 | 3,15,000 ₹3,15,000 | 1,47,000 ₹1,47,000 Lowest | 3,45,000 ₹3,45,000 |
| 1.05 | Clearing and grubbing road land including uproofing rank vegetation. Grass bushes, Shrubs, saplings and trees girth upto 300mm removal of stumps of trees cut earlier and disposal of unserviceable. (C) By mechanical means in area of light jungle | 6.77 | Hectare | 10,83,200 ₹10,83,200 | 10,15,500 ₹10,15,500 | 2,26,476.81 ₹2,26,476.81 Lowest | 11,17,050 ₹11,17,050 |
| 1.06 | Excavation for foundation in sand, gravel, clay soft soils and murrum etc. including shoring, strutting dewatering as necessary and disposing of the excavated stuff as directed. (A) Depth upto 3.0 M. and lead upto 100m for 10 Cum | 94.05 | Cu.M | 61,132.5 ₹61,132.5 | 51,727.5 ₹51,727.5 Lowest | 83,704.5 ₹83,704.5 | 65,364.75 ₹65,364.75 |
| 1.07 | Excavation for foundation in sand, gravel, clay soft soils and murrum etc. including shoring, strutting dewatering as necessary and disposing of the excavated stuff as directed.
(B) Depth from 3.0 to 6.0 M.and lead upto 100m for 10 Cum | 1,549 | Cu.M | 14,71,550 ₹14,71,550 | 10,84,300 ₹10,84,300 Lowest | 14,71,550 ₹14,71,550 | 15,24,216 ₹15,24,216 |
| 1.08 | Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering. | 2,450 | Cu.M | 13,13,200 ₹13,13,200 | 7,35,000 ₹7,35,000 Lowest | 14,70,000 ₹14,70,000 | 11,02,500 ₹11,02,500 |
| 1.09 | Disposal of remaining excavated Earth after filling in foundations and plinth as per direction of Engineer in-charge including loading from site and unloading at disposal site etc. complete.
Lead upto 5.00 km | 490 | Cu.M | 2,74,400 ₹2,74,400 | 2,45,000 ₹2,45,000 | 2,20,500 ₹2,20,500 Lowest | 3,28,300 ₹3,28,300 |
Tender Value
₹10.2 Cr
EMD Value
₹20.4 L
Closing Date
27 Jan 2024, 2:00 pmClosed
The Exe.,Engg., PWD, WD-I, Daman.
The Multi Office Complex, PWD, 2nd Floor, Near Moti Daman Market, Moti Daman.
Remaining work of Renovation and Alteration of Sports Complex situated in Fort Area, Moti Daman.(E-11598)(Balance Work) (2nd Call)
2024_DAMAN_3289_1
Tender Notice No. 123/2023-24
Open Tender
Civil Works
Works
365 days
Daman District.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
The Exe.,Engg., PWD, WD-I, Daman.
₹20.4 L
The Exe.,Engg., PWD, WD-I, Daman.
3 Feb 2024
10 Jan 2024
27 Jan 2024
10 Jan 2024
27 Jan 2024
10 Jan 2024
20 Jan 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Items : | |||||
| 1.01 | Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. work | 54.03 | Cu.M | - | - |
| 1.02 | Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.
(ii) In Cement Mortar. | 250 | Cu.M | - | - |
| 1.03 | Dismentling steel work including distempering and stacking the materials with all lead and lift. | 500 | Kg | - | - |
| 1.04 | Providing and fixing dowel bars of minimum 32mm dia. for anchoring by drilling holes in foundation strata including necessary bending, hooking of dowel bars and grouting the holes complete as per detailed drawing and as directed. | 150 | M | - | - |
| 1.05 | Clearing and grubbing road land including uproofing rank vegetation. Grass bushes, Shrubs, saplings and trees girth upto 300mm removal of stumps of trees cut earlier and disposal of unserviceable. (C) By mechanical means in area of light jungle | 6.77 | Hectare | - | - |
| 1.06 | Excavation for foundation in sand, gravel, clay soft soils and murrum etc. including shoring, strutting dewatering as necessary and disposing of the excavated stuff as directed. (A) Depth upto 3.0 M. and lead upto 100m for 10 Cum | 94.05 | Cu.M | - | - |
| 1.07 | Excavation for foundation in sand, gravel, clay soft soils and murrum etc. including shoring, strutting dewatering as necessary and disposing of the excavated stuff as directed.
(B) Depth from 3.0 to 6.0 M.and lead upto 100m for 10 Cum | 1,549 | Cu.M | - | - |
| 1.08 | Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering. | 2,450 | Cu.M | - | - |
| 1.09 | Disposal of remaining excavated Earth after filling in foundations and plinth as per direction of Engineer in-charge including loading from site and unloading at disposal site etc. complete.
Lead upto 5.00 km | 490 | Cu.M | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_3413.xls
BOQ • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .