| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | L1 | Accepted-AOC Work Award |
| Sl No | Description | Qty | Unit | AG BUILDERS L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged brick masonry for the required height and disposing the debris away from the site including cost of labours, lead, lift, tools & plants, etc. complete. | 4.5 | m³ | 320 ₹1,440 Lowest |
| 2.00 | Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of all labours, lead, lift, T & P, etc. complete. | 12.09 | m³ | 130 ₹1,571.7 Lowest |
| 3.00 | Providing PCC 1:3:6 for foundation with 20 mm size machine crushed HBG metal including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc. complete. | 1.15 | m³ | 6,100 ₹7,015 Lowest |
| 4.00 | Brick work in CM 1:5 using fly ash bricks including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc. complete. | 5.5 | m³ | 6,500 ₹35,750 Lowest |
| 5.00 | Random Rubble Masonry in cement mortar 1:6 including plasticiser at the rate of 100 ml per bag of cement, cost of all materials, labour, lead, lift, curing, etc. complete. | 2.76 | m³ | 6,000 ₹16,560 Lowest |
| 6.00 | Random Rubble Masonry without cement mortar for the seepage of collected rainwater including cost of all materials, labour, lead, lift, pipes fixing in weep holes for drainage, etc. complete. | 2.17 | m³ | 3,500 ₹7,595 Lowest |
| 7.00 | Plastering in walls with C.M 1:5, 12 mm thick including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc. complete. | 42 | m2 | 280 ₹11,760 Lowest |
| 8.00 | Flush pointing in CM 1:3 for RR masonry including plasticiser at the rate of 100 ml per bag of cement, cost of all materials, labour, lead, lift, etc. complete. | 6.19 | m2 | 300 ₹1,857 Lowest |
| 9.00 | White washing two coats with shell lime & DDL fevicol binder at the rate of 250 gm. per 10 kg bag of lime including cost of all materials, labours, lead, lift, scaffolding, etc. complete. | 48.2 | m2 | 40 ₹1,928 Lowest |
| 10.00 | Supplying, jointing and fixing in position of 2.5 feet dia & 1 feet height casings for earth pits including cost of all materials, lead, lift, labour charges, etc. complete as directed by the Engineer at site. | 8 | No | 500 ₹4,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
9 Oct 2025, 2:00 pmClosed
SE/TEDC/Tuticorin
131 Ettayapuram Road Tuticorin
Repair and maintenance works to the 11 KV Yard South end damaged cable trench brick walls and rainwater drainage trench provision near Section office in 110/33-11 KV Kalugumalai SS premises.
2025_EB_604404_2
Spc.11/25-26/SE/TEDC/AEE/C/TTN
Open Tender
Civil Works - Others
Item Rate
Kalugumalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,200
17 Nov 2025
4 Oct 2025
10 Oct 2025
4 Oct 2025
9 Oct 2025
4 Oct 2025
4 Oct 2025 - 9 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .