Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.3 L+₹45,025.10 (5.09%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹9.7 L+₹82,846.88 (9.37%)Admitted-Finance B 84 SATYAJIT PARK B 84 SATYAJIT PARK J P AVENUE DURGAPUR 713211 713211 BARDHAMAN WEST BENGAL 713211 | PASCHIM BARDHAMAN | WEST BENGAL | 713211 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DESHDUT INFRA CONSULTANCY PRIVATE LIMITED L1 | DEBAYAN KONAR L3 | R.A. Enterprise L2 |
|---|---|---|---|---|---|---|
| 1.00e-Tender for CONSTRUCTION OF TARGET POLE AT ALL 23 Nos. HO SITES OF BURHI GANDAK SUB-DIVISION, CWC, MUZAFFARPUR | ||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 2.82 | Cum | 3,000 ₹8,460 | 2,155 ₹6,077.1 | 580 ₹1,635.6 Lowest |
| 2.01 | Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 32.2 | Sqm | 4,000 ₹1,28,800 | 2,025 ₹65,205 | 690 ₹22,218 Lowest |
| 3.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centring, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources) | 2.54 | Cum | 8,000 ₹20,336 | 3,022 ₹7,681.92 Lowest | 16,400 ₹41,688.8 |
| 4.01 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and
manufacture | 139.01 | Sqm | 1,950 ₹2,71,069.5 | 156 ₹21,685.56 Lowest | 300 ₹41,703 |
| 5.01 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 5,552.2 | Kg | 82 ₹4,55,280.4 Lowest | 156 ₹8,66,143.2 | 148 ₹8,21,725.6 |
Tender Value
₹9.3 L
EMD Value
₹18,580
Closing Date
3 Feb 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer LGD1 CWC Adalatganj Amarnath Road Patna
CONSTRUCTION OF TARGET POLE AT ALL 23 Nos. HO SITES OF BURHI GANDAK SUB-DIVISION, CWC, MUAZAFFARPUR
2026_CWC_895427_1
LGD-1/CWC/HQ-65/Bench Mark/2025-26/07
Open Tender
Civil Works
Works
As per tender documents
As per tender documents
7 documents required · 7 mandatory
₹0
₹18,580
Patna
18 Mar 2026
23 Jan 2026
4 Feb 2026
23 Jan 2026
3 Feb 2026
23 Jan 2026
23 Jan 2026 - 3 Feb 2026
27 Jan 2026
e-Tender for CONSTRUCTION OF TARGET POLE AT ALL 23 Nos. HO SITES OF BURHI GANDAK SUB-DIVISION, CWC, MUZAFFARPUR
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centring, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
stage.html
html • 0.04 MB
technical_941166.pdf
techsummary_941166.pdf
finance_941166.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
finaltenderdocumenttargetpolemuzaffarpur23012026.pdf
Tender Documents • 2.42 MB
BOQ_941166.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .