Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance GOYLA PARA BARAKAR PASCHIM BARDHAMAN PASCHIM WEST BURDWAN BARDHAMAN WEST BENGAL 713324 | PASCHIM BARDHAMAN | WEST BENGAL | 713324 | +9.49% | ₹3.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.4 L+₹574.15 (0.17%)Admitted-Fee/PreQual/Technical/Finance MANDIRIA BAZAR KULTI N BASAKAR PASCHIM BARDHAMAN PASCHIM WEST BURDWAN WEST BENGAL 711334 INDIA | KULTI | PASCHIM BARDHAMAN | WEST BENGAL | 711334 | +29.42% | ₹3.4 L+₹574.15 (0.17%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.7 L+₹32,103.49 (9.60%)Admitted-Fee/PreQual/Technical/Finance TALHANJA HOUSING COLONY TALHANJA CHIRKUNDA DHANBAD JHARKHAND 828202 | DHANBAD | DHANBAD | JHARKHAND | 828202 | +20.00% | ₹3.7 L+₹32,103.49 (9.60%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
14 Aug 2026, 5:00 pmClosed
GM CV AREA
OFFICE OF THE GENERAL MANAGER CV AREA XII
Repairing and maintenance of Boundary wall at Guest House.
2026_BCCL_362933_1
BCCL/XII/ACE/ e-Tender-39/2026-27/39 Date-01.08.2026
Open Tender
Civil Works - Others
Percentage
22 days
CV AREA
Please refer to the tender document.
3 documents required · 3 mandatory
₹3,900
18 Aug 2026
3 Aug 2026
17 Aug 2026
3 Aug 2026
14 Aug 2026
4 Aug 2026
3 Aug 2026 - 7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING AND DEMOLISHING Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 7.07 | CUM | 1,232.8 | ₹8,717.13 |
| 2 | EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 19.91 | CUM | 214.15 | ₹4,263.3 |
| 3 | CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 6.83 | CUM | 5,430.65 | ₹37,075.05 |
| 4 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in Foundation and upto plinth level | 21.34 | CUM | 5,441.62 | ₹1,16,096.96 |
| 5 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor two level in : | 5.12 | CUM | 6,038.5 | ₹30,911.08 |
| 6 | FINISHING 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | 125.7 | SQM | 222 | ₹27,905.4 |
| 7 | Color Washing on Old works (one or more coats) | 198.9 | SQM | 35.88 | ₹7,136.53 |
| 8 | EARTH WORK Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 56.7 | CUM | 299.7 | ₹16,992.99 |
| 9 | REINFORCED CEMENT CONCRETE Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.45 | CUM | 6,520.45 | ₹2,934.2 |
| 10 | REINFORCED CEMENT CONCRETE Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 30 | KG | 75.66 | ₹2,269.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_375843.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .