| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-AOC | 1 | Accepted-AOC Lowest tenderer | |
| 2 | 2₹2.4 L+₹9,357.70 (4.10%)Rejected-AOC | 2 | Rejected-AOC . |
| Sl No | Description | Qty | Unit | G. Maharajan L1 | G.Periyasamy L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 25 | M3 | 184.5 ₹4,612.5 Lowest | 192 ₹4,800 |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 5 | M3 | 5,055.4 ₹25,277 Lowest | 5,257 ₹26,285 |
| 3.00 | Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification | 59 | M2 | 459.8 ₹27,128.2 Lowest | 478 ₹28,202 |
| 4.00 | E) Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 13 | M3 | 6,505.4 ₹84,570.2 Lowest | 6,765 ₹87,945 |
| 5.00 | Granolithic Floor finishing with Cement Concrete 1:2:4 (One part of cement, two parts of sand and four parts of ISS HBG metal) mix using 10mm to 12mm ISS size HBG metal to 25mm thick including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:39-F | 14 | M3 | 165.5 ₹2,317 Lowest | 173 ₹2,422 |
| 6.00 | Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification | 11 | M2 | 505.8 ₹5,563.8 Lowest | 526 ₹5,786 |
| 7.00 | Supply and fabrication and placing in position of TMTsteel roads to required size and length as directed by the departamental officers including cost of binding wire, cutting, bending and tying etc., inclduing cost and conveyance of all materials to side and all labour charges etc., complete as per standard specification TNDSS NO: 97 V.VI (S6) VII (S^) VII-3 | 400 | Kg | 88.87 ₹35,548 Lowest | 93 ₹37,200 |
| 8.00 | Rainforced Cement Concrete 1:1 1/2:3 Mix (one part cement, One and Half part sand and Three part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 3 | M3 | 8,053.7 ₹24,161.1 Lowest | 8,376 ₹25,128 |
| 9.00 | Collection and Supply Filling 40 MM ISS HBG Metal from approved quary including cost of materila and labor charges etc., | 5 | M3 | 1,237.5 ₹6,187.5 Lowest | 1,288 ₹6,440 |
| 10.00 | Collection and Supply Filling 20 MM ISS HBG Metal from approved quary including cost of materila and labor charges etc., | 5 | M3 | 1,690.5 ₹8,452.5 Lowest | 1,759 ₹8,795 |
Tender Value
₹2.8 L
EMD Value
₹2,750
Closing Date
7 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Aundipatti Town Panchayat
Costruction of Rain Water Harwasting Ward No 5 Government Boys Higher Secondary School Front Side in Aundipatti Town Panchayat
2025_DTP_607511_1
383-4-2025
Open Tender
Civil Works
Works
60 days
Costruction of Rain Water Harwasting Ward No 5 Gov
Refer to tender document
2 documents required · 2 mandatory
₹0
₹2,750
Yes
Aundipatti Town Panchayat
29 Jan 2026
22 Sept 2025
8 Oct 2025
22 Sept 2025
7 Oct 2025
22 Sept 2025
22 Sept 2025
Amount
Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification.
Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification
E) Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Granolithic Floor finishing with Cement Concrete 1:2:4 (One part of cement, two parts of sand and four parts of ISS HBG metal) mix using 10mm to 12mm ISS size HBG metal to 25mm thick including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:39-F
Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification
Supply and fabrication and placing in position of TMTsteel roads to required size and length as directed by the departamental officers including cost of binding wire, cutting, bending and tying etc., inclduing cost and conveyance of all materials to side and all labour charges etc., complete as per standard specification TNDSS NO: 97 V.VI (S6) VII (S^) VII-3
Rainforced Cement Concrete 1:1 1/2:3 Mix (one part cement, One and Half part sand and Three part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Collection and Supply Filling 40 MM ISS HBG Metal from approved quary including cost of materila and labor charges etc.,
Collection and Supply Filling 20 MM ISS HBG Metal from approved quary including cost of materila and labor charges etc.,
Collection and Supply M Sand from approved quary including cost of materila and labor charges etc.,
G.Periyasamy (BID ID -1478733)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .