Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | -45.08% | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 L+₹67,878.65 (12.4%)Admitted-Finance | -38.25% | ₹6.1 L+₹67,878.65 (12.4%) | L2 | Admitted-Finance |
| 3 | L3₹6.3 L+₹82,289.19 (15.1%)Admitted-Finance | -36.80% | ₹6.3 L+₹82,289.19 (15.1%) | L3 | Admitted-Finance |
| 4 | L4₹6.4 L+₹90,239.84 (16.5%)Admitted-Finance | -36.00% | ₹6.4 L+₹90,239.84 (16.5%) | L4 | Admitted-Finance |
| 5 | L5₹6.8 L+₹1.4 L (25.1%)Admitted-Finance | -31.31% | ₹6.8 L+₹1.4 L (25.1%) | L5 | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹19,880
Closing Date
16 Jul 2026, 6:00 pmClosed
Er Amit Sharma
PWD Div EAST
Waterproofing of Directorate of Tourism Jammu
2026_PWDJK_315360_2
34 of 2026-2027 dated 09-07-2026
Open Tender
Civil Works
Percentage
60 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
as per NIT
₹19,880
18 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
16 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 0.85 | Cum | 1,458.45 | ₹1,239.68 |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm | 290.88 | Sqm | 57 | ₹16,580.16 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge: 1:3:6 or richer mix (i/c equivalent design mix) | 14.18 | Cum | 1,725.2 | ₹24,463.34 |
| 4 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead | 74.35 | Sqm | 38.9 | ₹2,892.21 |
| 5 | Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead. With cement mortar 1:4 (1 cement : 4 fine sand) | 4.65 | Sqm | 441.4 | ₹2,052.51 |
| 6 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 18.59 | Sqm | 283.8 | ₹5,275.84 |
| 7 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) | 9.48 | Sqm | 306.85 | ₹2,908.94 |
| 8 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 22.3 | Sqm | 18.7 | ₹417.01 |
| 9 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 2 mm thick | 22.3 | Sqm | 181.05 | ₹4,037.42 |
| 10 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. | 22.3 | Sqm | 66.85 | ₹1,490.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1022600.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .