| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.3 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹60.4 L+₹8,735.75 (0.14%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹61.0 L
EMD Value
₹61,000
Closing Date
21 Dec 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Krishnagiri
The Project Director DRDA Krishnagiri
Krishnagiri District Hosur Block RURBAN 2018-19 and 2019-20 Grey Water Management 3 Works at Belathur and Sevaganapalli Panchyats package No_TN-04-KRI-02
2021_RDTN_216802_1
RocNo_10503_2015_R4_15_10_2021
Open Tender
Civil Works - Others
Item Rate
90 days
Hosur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹61,000
DRDA Krishnagiri
4 Jan 2022
13 Dec 2021
21 Dec 2021
13 Dec 2021
21 Dec 2021
13 Dec 2021
15 Dec 2021
180 days
Amount
1.Construction of Horizontal Grey Water Filter Bed and Drainage at Kalaignar Nagar, Jeeva Nagar and Rajiv Nagar Villages H/o Belathur Rs. 40.00 /-Lakhs.
Construction of Horizontal Grey Water Filter Bed and Drainage at Kalaignar Nagar
Earth work excavation in all soil such as redearth, hard stiff clay soil, stiff black cotton soil, hard redearth, shales, murrams, gravel, hard rock not requried blasting etc., Complete
Cement concrete 1 : 4 : 8 mix using 40mm ISS HBG metal Including all cost and Conveyance and all labour charges etc., Complete
Supplying and erecting steel centering for sides & Soffits including necessary support & Strutting upto 3.29m Height for Plane surfaces in all floors with all Cross bracings using mild steel of size 90X 60cm & 10 gauge Stiffened, welded with Steel anlge
Supplying and fabricating and placing in position MS or RTS reinforcement works and all cost
Cement concrete 1 : 2 : 4 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Distembering two coats with best approved distember including cost and conveyance of all meterials to site and all labour charges Etc., Complete
Collection and supply of 63 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 40 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 6 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of Carbon Coal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Supply and Fixing of Weld Mesh etc., complete
Construction of Horizontal Grey Water Filter Bed and Drainage at Jeeva Nagar
Earth work excavation in all soil such as redearth, hard stiff clay soil, stiff black cotton soil, hard redearth, shales, murrams, gravel, hard rock not requried blasting etc., Complete
Cement concrete 1 : 4 : 8 mix using 40mm ISS HBG metal Including all cost and Conveyance and all labour charges etc., Complete
Supplying and erecting steel centering for sides & Soffits including necessary support & Strutting upto 3.29m Height for Plane surfaces in all floors with all Cross bracings using mild steel of size 90X 60cm & 10 gauge Stiffened, welded with Steel anlge
Supplying and fabricating and placing in position MS or RTS reinforcement works and all cost
Cement concrete 1 : 2 : 4 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Distembering two coats with best approved distember including cost and conveyance of all meterials to site and all labour charges Etc., Complete
Collection and supply of 63 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 40 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 6 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of Carbon Coal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Supply and Fixing of Weld Mesh etc., complete
Construction of Horizontal Grey Water Filter Bed and Drainage at Rajiv Nagar
Earth work excavation in all soil such as redearth, hard stiff clay soil, stiff black cotton soil, hard redearth, shales, murrams, gravel, hard rock not requried blasting etc., Complete
Cement concrete 1 : 4 : 8 mix using 40mm ISS HBG metal Including all cost and Conveyance and all labour charges etc., Complete
Supplying and erecting steel centering for sides & Soffits including necessary support & Strutting upto 3.29m Height for Plane surfaces in all floors with all Cross bracings using mild steel of size 90X 60cm & 10 gauge Stiffened, welded with Steel anlge
Supplying and fabricating and placing in position MS or RTS reinforcement works and all cost
Cement concrete 1 : 2 : 4 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Distembering two coats with best approved distember including cost and conveyance of all meterials to site and all labour charges Etc., Complete
Collection and supply of 63 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 40 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 6 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of Carbon Coal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Supply and Fixing of Weld Mesh etc., complete
Construction of Drianage
Earth work excavation for Foundation in all soil and sub soil to fukll depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for Foundation Including Watering wherever necessary and laid in layers of not more then 15 cm Thick all cost and Conveyance and all labour charges etc., Complete
Supplying and erecting centering for sides & Soffits including necessary support & Strutting upto 3.29m Height for Plane surfaces in all Cost
Supplying and fabricating and placing in position MS or RTS reinforcement works and all cost
Cement concrete 1 : 2 : 4 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Name Board Charges
2.Construction of Horizontal Grey Water Filter Bed and Drainage at Singasathanapalli Villages H/o Belathur Rs. 9.93 /-Lakhs.
Earth work excavation in all soil such as redearth, hard stiff clay soil, stiff black cotton soil, hard redearth, shales, murrams, gravel, hard rock not requried blasting etc., Complete
Cement concrete 1 : 4 : 8 mix using 40mm ISS HBG metal Including all cost and Conveyance and all labour charges etc., Complete
Supplying and erecting steel centering for sides & Soffits including necessary support & Strutting upto 3.29m Height for Plane surfaces in all floors with all Cross bracings using mild steel of size 90X 60cm & 10 gauge Stiffened, welded with Steel anlge
Supplying and fabricating and placing in position MS or RTS reinforcement works and all cost
Cement concrete 1 : 2 : 4 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Distembering two coats with best approved distember including cost and conveyance of all meterials to site and all labour charges Etc., Complete
Collection and supply of 63 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 40 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 6 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of Carbon Coal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Supply and Fixing of Weld Mesh etc., complete
Construction of Drianage
Earth work excavation for Foundation in all soil and sub soil to fukll depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for Foundation Including Watering wherever necessary and laid in layers of not more then 15 cm Thick all cost and Conveyance and all labour charges etc., Complete
Supplying and erecting centering for sides & Soffits including necessary support & Strutting upto 3.29m Height for Plane surfaces in all Cost
Supplying and fabricating and placing in position MS or RTS reinforcement works and all cost
Cement concrete 1 : 2 : 4 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Name Board Charges
3.Construction of Horizontal Grey Water Filter Bed and Drainage at Sokkarasanapalli Villages H/o Sevaganapalli Rs. 11.04 /-Lakhs.
Earth work excavation in all soil such as redearth, hard stiff clay soil, stiff black cotton soil, hard redearth, shales, murrams, gravel, hard rock not requried blasting etc., Complete
Cement concrete 1 : 4 : 8 mix using 40mm ISS HBG metal Including all cost and Conveyance and all labour charges etc., Complete
Supplying and erecting steel centering for sides & Soffits including necessary support & Strutting upto 3.29m Height for Plane surfaces in all floors with all Cross bracings using mild steel of size 90X 60cm & 10 gauge Stiffened, welded with Steel anlge
Supplying and fabricating and placing in position MS or RTS reinforcement works and all cost
Cement concrete 1 : 2 : 4 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Distembering two coats with best approved distember including cost and conveyance of all meterials to site and all labour charges Etc., Complete
Collection and supply of 63 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 40 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of 6 mm HBG metal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Collection and supply of Carbon Coal and filling in to soak pits Including cost and conveyance to the site and all Labour charges for filing as per standard specification etc., Complete as per Standard Specification
Supply and Fixing of Weld Mesh etc., complete
Construction of Drianage
Earth work excavation for Foundation in all soil and sub soil to fukll depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for Foundation Including Watering wherever necessary and laid in layers of not more then 15 cm Thick all cost and Conveyance and all labour charges etc., Complete
Supplying and erecting centering for sides & Soffits including necessary support & Strutting upto 3.29m Height for Plane surfaces in all Cost
Deck Slab Centering
Supplying and fabricating and placing in position MS or RTS reinforcement works and all cost
Cement concrete 1 : 2 : 4 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Cement concrete 1 : 1.5 : 3 mix using 40mm ISS HBG metal for all RCC items works excluding cost of rainforcement and Fabricating Charges etc.,
Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SA Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .