Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
22 May 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE/Valapady/TANGEDCO
EE TANGEDCO VAAPADY
Work Contract for Karumanthurai section of Valapady Division
2023_EB_315873_1
EE/Valapady/WC.001/2023-24
Open Tender
Electrical Works
Works
365 days
Karumanthurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
29 May 2023
17 May 2023
23 May 2023
17 May 2023
22 May 2023
17 May 2023
Amount
Excavation of pole pit up to 27”(8.0m) pole
Stay bit 4.5” to 5” depth
RCC poles/Metal pole up to 8.00m (27’)
Excavation of pole pit up to 30”(9.0m) pole
RCC poles/Metal pole up to 9.00m (30’)
Erection of stay set complete
HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2
LT 3 Phase cross arm
LT single Phase cross arm
HT / LT TI Fitting
Fixing of HT Pin Insulators (11/22/33KV)
Fixing of HT 22KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of knob
7/3.35mm ACSR 7/3.15mmAAAC
7/2.59mm ACSR & 7/2.50mm AAAC
Erection of Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel , belting angle (Except erection of transformer)
Single pole Structure
Transporting of poles from Stores to Site up to 27”
Transporting of poles from road side to pole pit up to 27”
Transporting of poles from Stores to Site up to 30”
Transporting of poles from road side to pole pit up to 30”
Loading of poles up to 27”
Unloading of poles up to 27”
Loading of poles up to 30”
Unloading of poles up to 30”
Loading / Unloading of transformer up to 200KVA
Erection of transformer up to 200 KVA
Transporting of Materials / Conductors and other materials (excluding loading & unloading charges)
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .