Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹4.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹4.3 Cr+₹10.5 L (2.54%)Rejected-Finance NA | NA | NA | 121004 | ₹4.3 Cr+₹10.5 L (2.54%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.3 Cr+₹12.5 L (3.02%)Rejected-Finance | ₹4.3 Cr+₹12.5 L (3.02%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.5 Cr+₹37.6 L (9.04%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹4.5 Cr+₹37.6 L (9.04%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical CHITAVAR JOGI MEETAI HATHRAS | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹5.5 Cr
EMD Value
₹11.0 L
Closing Date
30 Sept 2024, 4:00 pmClosed
Superintending Engineer
3rd Circle Irrigation Works, 139, Mall Road, Pratappura, Agra
Restoration work of outer section and concrete works from Km 0.000 to Km 21.200 (up to tail) of Agra Rajwah under Lower Division, Agra Canal, Agra in district Agra.
2024_UPIDC_954834_4
05/SE/2024-25
Open Tender
Civil Works
Item Rate
180 days
Agra Rajwah Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹11.0 L
18 Oct 2024
16 Sept 2024
30 Sept 2024
16 Sept 2024
30 Sept 2024
16 Sept 2024
Amount
Videography/Photography of Work in canal before, during and after completion of work by DRONE as per requirement including supply of Softcopy of Videography & photography in pendrive & Hardcopy of photography (min 01 photo per 500m) in 03 sets and vehicle movement as per direction of Engineer in Charge.
Cleaning thick bushes and thorny jungle without uprooting including disposal of rubbish material with 60 m distance as per direction of Engineer-in-charge.
Earthwork in Filling in 20 cm layers, including ramming and dressing the surface to the required levels & slopes,proper compaction, labour, T&P etc complete and also including lead up to 100.0 M. and lift up to 1.50m as directed by the Engineer-in-charge.
Dismentling R.C.C. slab including stacking of dismenlted materials within 60.0m distance including all cost of labour etc complete.
Dismentling Brick work or stone work in cement mortar and including stacking of dismenlted materials within 60.0m distance including all cost of labour etc complete.
Earthwork in cutting or in embankment ordinary soil, excavation to be in the form of regular pits and earthwork in embankment to be in 20 cm layers, including ramming and dresiing the surface to the required levels and slopes and also 1.50 m lift and 30 m lead. The earth from cuttingto be used in making embankment or to be deposited as spoil bank within 30 m distance as directed by the Engineer-in-charge.
C.C. 1:3:6 (1 Cement : 3 Coarse Sand : 6 Stonegrit ) in foundation with stone ballast 20-40 mm size including all labour and T&P required for completion of work as directed by Engineer-in -charge.
First Class brick work in 1:4 (1 Cement : 4 Coarse Sand ) Cement Mortar including cost of all material & labour required for completion of work as directed by Engineer-in -charge.
Centering and shuttering for R.C.C. works/R.B. work including cost of centering and shuttering upto 3.00 M height & all labour and T&P etc. Complete as directed by Engineer-in -charge.
Centering and shuttering for C.C. Work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintes, sunshades, column and walls etc. as directed by Engineer-in -charge.
R.C.C. 1:1:2 (1 Cement : 1 Coarse Sand : 2 Stonegrit) including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge.
C.C. 1:1:2 (1 Cement : 1 Coarse Sand : 2 Stonegrit) including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge.
Bending, Binding, cutting and placing of reinforcement including cost of steel,binding wire, labour and T&P etc. Complete as directed by Engineer-in -charge.
Struck Deep Cement Pointing in brick masonry work in 1:2 (1 Cement : 2 Coarse Sand) Cement Mortar / Sqm including cost of all material & labour required for completion of work as directed by Engineer-in -charge.
S/F 50 mm dia P.V.C. Spout Pipe including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
Providing & laying brick on edge soling (kharanja) on prepared subgrade with brick on end edging & filling joints with sand and earth spreading 25 mm thick layer of earth over brick soiling, watering and rolloing the same with three wheel road roller 80-100 KN.
Filling E.C. bags with Local Earth , Hand Sewing by suja & sutli and placing in position within 60.0m distance including cost of E.C. bags, all materials, labour and T&P etc complete.
Providing & fixing of NP-3 hume pipe of 900 mm dia including cost of all material, labour,carriage, loading, unloading etc. complete as directed by Engineer in charge.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade as per requirement of site. Two or more shade coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture as per direction of Engineer-in-Charge.
C.C 1:2:4 (1 Cement : 2 Coarse Sand : 4 Stonegrit ) in foundation with stone ballast 20-40 mm size including all labour and T&P required for completion of work as directed by Engineer-in -charge.
R.C.C 1:1.5:3 (1Cement : 1.5 Coarse sand : 3 Stonegrit) with stone ballast 10-20 mm size and coarse sand including all labour and T&P required for completion of work as directed by Engineer-in -charge.
S/F Sign Board size of 4x3 Ft. incliuding all carriage errection painting and letter writing etc. with all cost of material,labour T&P etc Complete.
Random Coarse Stone Pitching with Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) having thickness of 15.00 cm over 15 cm thick Filler Material including cost of all material & labour required for completion of work as directed by Engineer-in -charge.
Random Coarse Stone Masonry with Cement Mortar 1:4 in foundation and plinth including cost of all material & labour required for completion of work as directed by Engineer-in -charge.
Raised and Cut Cement Pointing in stone pitching in 1:3 (1 Cement : 3 Coarse Sand) Cement Mortar / Sqm including cost of all material & labour required for completion of work as directed by Engineer-in -charge.
Providing & Fixing NP-2 hume pipe of 100 mm dia including cost of all material, labour,carriage, loading, unloading etc. complete as directed by engineer in charge.
Providing & Fixing NP-2 hume pipe of 150 mm dia including cost of all material, labour,carriage, loading, unloading etc. complete as directed by engineer in charge.
Supplying , Fabrication and Erection of steel gate at site i/c cost of all materials, carriage upto site, painting , openers/handle etc. complete.
M/S S R CONSTRUCTION
chahar constructions
S F INFRA PROJECTS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .