| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.5 LAccepted-AOC 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹54.5 L | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
17 Apr 2023, 2:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE -1, GORAKHPUR
CONSTRUCTION OF VRB AND HEAD REGULATOR AT AHIRAULI DISTRIBUTARY UNDER IRRIGATION DIVISION GORAKHPUR IN DISTRICT MAHARAJGANJ.
2023_UPIDC_793326_10
07/SE/2022-23
Open Tender
Civil Works
Item Wise
120 days
SISWA BAZAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.4 L
Yes
1 Nov 2023
5 Apr 2023
17 Apr 2023
5 Apr 2023
17 Apr 2023
5 Apr 2023
Amount
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge.
Earth work for making Ramp, Diversion and making section profile including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Supply and Laying of coarse sand (FM not less then 2) in form of fillter material including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Supply and Laying of crushed grit (10mm-20mm) in form of fillter material including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.00 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
1st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand of FM. Not less then 2.00, including all cost of materials,T&P and labours and other accessories required for proper completion of work
Bending, binding cutting placing in position rainforcement steel including cost of binding wire and tack wilding with material. and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
Laying R.C.C. work in 1:1.5:3 (M20) sonbhadra coarse sand of FM. Not less then 2.00 and dala grit (10mm to 20mm.) for floor ,cut of wall ,toe wall including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.00 and dala grit (10mm to 20mm.) for Slab,wearing coat ,bed block coping including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work.
Dismelting of old V.R.B. and proper disposal including all cost of materials,T&P and labours etc.
1st class Dry brick on Edge soling including prepration of sub-grade to prescrib Slop ,filing joint with local sand/silt including cost of all material ,labour, t&p etc. required for proper completion of worK. T&P etc.
Fixing wheel guard stone including cost of all material ,labour, t&p etc. required for proper completion of work
Sign borad at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of worK.
Supply and fixing PVC pipe 110mm for drainge spout ,labour, t&p etc. required for proper completion of worK.
Providing one coat of VG -30 bitumen painting with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. Slab including cost of all material labour and T & P etc.
Supply and laying of Mirjapur Stone Boulder 25 to 60 kg. Lift upto 1.50M and lead of 60.00 M. including cost of all material, labour, T & P etc. complete for work. as per direction of Engineer-in-charge.
Deep Struck pointing in 1:2 on Brick work, including all cost of materials,T&P and labours and other accessories required for proper completion of work
Laying of C.C. in M-15 (1:2:4) in slope lining with coarse sand (F.M not less then 2 )and Crushed stone grit(10mm-20mm) including cost of all material, labour, T&P required for proper completion of work as directed by Engineer-in-Charge .
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .