Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 CrAccepted-AOC 00 HANSH NAGAR RADHA RAMAN ROAD MAINPURI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.5 Cr+₹22.0 L (1.66%)Rejected-AOC CHAS ROAD JAINA MORE JARIDIH BOKARO JHARKHAND | BOKARO | JHARKHAND | 825102 | L2 | Rejected-AOC L2 | |
| 3 | L3₹14.8 Cr+₹1.5 Cr (11.6%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹15.2 Cr+₹1.9 Cr (14.4%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹15.6 Cr
EMD Value
₹31.3 L
Closing Date
9 Jul 2024, 5:00 pmClosed
Executive Engineer, R.W.D, Works Division, Bokaro
Combined Building of Civil S.D.O office, Old Chas Court Area, Bokaro, Chas
Strengthening of Road from (i) Mango Chowk to R.E.O. Road Mango Basti via Kewat Tola, Kapsiya (L-3.150 Km), (ii) NH-23 to Shyampur (L-1.010 Km), (iii) P.W.D. Road Bahadurpur to Bandhudih Simana (L-1.310 Km), (iv) Khirabera via Agarda (L-5.000 Km)....
2024_RWD_87070_1
02/2024-25/RWD/EE/BOKARO
Open Tender
Civil Works
Percentage
450 days
Bokaro
Please refer Tender Documents
4 documents required · 4 mandatory
₹10,000
₹31.3 L
11 Sept 2025
28 Jun 2024
11 Jul 2024
28 Jun 2024
9 Jul 2024
28 Jun 2024
28 Jun 2024 - 9 Jul 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (i) Mango Chowk to R.E.O. Road Mango Basti via Kewat Tola, Kapsiya (L-3.150 Km.)
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | 1.2 | Ha | 19,760.3 | ₹23,712.36 |
| - | Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) | 985.05 | M3 | 52.6 | ₹51,813.63 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 3,627.56 | M3 | 131.3 | ₹4,76,298.63 |
| - | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)
Including Royalty etc@ Rs. 27.48 per cum but excluding the cost of watering, rolling & compaction. | 380 | M3 | 62.4 | ₹23,712 |
| - | Granular Sub-Base with Coarse Graded Material (Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | 675.2 | M3 | 1,864.97 | ₹12,59,227.74 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 392.13 | M3 | 2,149.42 | ₹8,42,852.06 |
| - | Prime Coat over WMM/WBM (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.) | 2,523.95 | M2 | 80.7 | ₹2,03,682.76 |
| - | Tack Coat on Granular surfaces treated with primer
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom. | 2,523.95 | M2 | 15.73 | ₹39,701.73 |
| - | Tack Coat on Bituminous surfaces
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 8,426.47 | M2 | 12.71 | ₹1,07,100.43 |
| - | Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen (Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.) | 273.76 | M3 | 7,991.18 | ₹21,87,665.44 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_117110.xls
BOQ Document • 0.51 MB
147134274.pdf
Tender Document • 0.18 MB
DOUBLEF2BIDDOCUMENTEffectivefrom12.10.2023on17.11.23MANGOCHOWK.pdf
Tender Document • 0.97 MB
147134276.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .