Updated dates
Tender Value
₹11.7 Cr
EMD Value
₹21.7 L
Closing Date
16 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
EE,NPD-2,DDA
EE,NPD-2,DDA
Supplying of potable water treated through RO plant for drinking purpose and supplying softened water for non- drinking purpose at Pocket 3,4,6,7,9,11,13 and 14, Sector A-1 to A-4, Narela Delhi.
2026_DDA_913994_1
03/EE/NPD-2/DDA/2026-27
Open Tender
Civil Works
1215 days
NARELA
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹21.7 L
CHIEF ENGINEER NARELA ZONE GTK DEPOT JAHANGIR PURI
20 Jun 2026
20 Jun 2026
17 Jul 2026
20 Jun 2026
16 Jul 2026
2 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Supplying of RO treated potable water for drinking purpose using RO plant of capacity 10000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years) | - | Each | 28,18,590 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Supplying of RO treated potable water for drinking purpose using RO plant of capacity 15000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years) | - | Each | 43,67,550 | - | BI01010001010000000000000515BI0100001114 |
| 3 | Supplying of RO treated potable water for drinking purpose using RO plant of capacity 25000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years) | - | Each | 69,98,875 | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing, installation and commissioning of water softening plant having a capacity of 150 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) | - | Each | 18,29,000 | - | BI01010001010000000000000515BI0100001116 |
| 5 | Providing, installation and commissioning of water softening plant having a capacity of 200 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) | - | Each | 20,35,500 | - | BI01010001010000000000000515BI0100001117 |
| 6 | Providing, installation and commissioning of water softening plant having a capacity of 250 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) | - | Each | 22,42,000 | - | BI01010001010000000000000515BI0100001118 |
| 7 | Providing, installation and commissioning of water softening plant having a capacity of 300 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) | - | Each | 25,96,000 | - | BI01010001010000000000000515BI0100001119 |
| 8 | Providing, installation and commissioning of water softening plant having a capacity of 425 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) | - | Each | 29,50,000 | - | BI01010001010000000000000515BI0100001120 |
| 8.1 | SCHEDULEOF QUANTITY (B) | - | - | - | - | BI01010001010000000000000515BI0100001121 |
| 9 | Day to day running, operation and maintenance of RO Plant & softening plant in Two shifts working (each shift having 8 working hours) for three years by deploying one skilled operator cum technician per shift as per direction and satisfaction of Engineer- in-Charge. | - | Each | 2,790.7 | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
NIT03.pdf
Tender Documents • 2.41 MB
BOQ_960524.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid