Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | ₹3.3 L | L1 | Accepted-AOC Below from the Estimate Rate |
| 2 | L2₹4.1 L+₹80,531.59 (24.2%)Rejected-AOC | ₹4.1 L+₹80,531.59 (24.2%) | L2 | Rejected-AOC Above from the Estimate Rate |
| Sl No | Description | Qty | Unit | NIZAR H L2 | MANOJ KUTTAN L1 |
|---|---|---|---|---|---|
| 1.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 5 | m3 | 45,000 ₹45,000 | 42,170 ₹42,170 Lowest |
| 2.00 | Centering for sides and soffits of R.C.C. slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. complying with std. specifications. | 23 | m2 | 16,100 ₹16,100 | 15,341 ₹15,341 Lowest |
| 3.00 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M- Sand) and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 6 | m3 | 56,952.5 ₹56,952.5 | 55,261.91 ₹55,261.91 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 6 | m3 | 59,400 ₹59,400 | 58,938 ₹58,938 Lowest |
| 5.00 | Plastering with cement mortar 1:3 (One part of Cement and three part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 144 | m2 | 1,00,800 ₹1,00,800 | 59,760 ₹59,760 Lowest |
| 6.00 | Supplying and fixing of 300mm dia RCC hume pipe and the rate including cost and conveyance of all materials to work site and all other labour charges etc. Complete with std. Specifications. | 45 | Rm | 1,35,000 ₹1,35,000 | 1,01,250 ₹1,01,250 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
10 Sept 2025, 3:00 pmClosed
THE EXECUTIVE OFFICER
NADUVATTAM TOWN PANCHAYAT
Maintenance of Drain at Panchayat Colony in aduvattam Town Panchayat.
2025_DTP_601353_1
326/2025-3
Open Tender
Civil Works
Works
45 days
NADUVATTAM TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,000
31 Mar 2026
8 Sept 2025
10 Sept 2025
8 Sept 2025
10 Sept 2025
8 Sept 2025
8 Sept 2025 - 10 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_718860.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .