Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.2 LAdmitted-Finance HOUSE NO 40 CHOTTI BARADARI PART I GARHA ROAD NEAR MEDICAL COLLEGE JALANDHAR PB 144022 | JALANDHAR | JALANDHAR | PUNJAB | 144022 | ₹79.2 L | L1 | Admitted-Finance |
| 2 | L2₹93.4 L+₹14.2 L (18.0%)Admitted-Finance | ₹93.4 L+₹14.2 L (18.0%) | L2 | Admitted-Finance |
| 3 | L3₹1.0 Cr+₹23.1 L (29.1%)Admitted-Finance | ₹1.0 Cr+₹23.1 L (29.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TARSAM LAL SAINI CONTRACTOR L3 | UNITED ENGINEERING CORPORATION L1 | Chander Mohan Arora Contractor L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 meter wide and not exceeding 1.5 meter in depth, for laying of Galvanized Iron (GI) or Ductile Iron (DI) tubing including getting out the excavated material in hard and dense soil, complete in all respects as specified and as directed. | 2,150.4 | Cubic Meter | 250 ₹5,37,600 | 100 ₹2,15,040 Lowest | 210 ₹4,51,584 |
| 2.00 | Returning filling, including spreading, leveling, watering, and well ramming in layers not exceeding 25 centimeter thick, complete in all respects as specified and as directed. | 2,091.93 | Cubic Meter | 50 ₹1,04,596.5 | 20 ₹41,838.6 Lowest | 35 ₹73,217.55 |
| 3.00 | Removing excavated material (soil) to a distance not exceeding 50 meters and depositing the material where specified and directed, at a level not exceeding 1.5 meter above the starting point. | 58.47 | Cubic Meter | 50 ₹2,923.5 | 20 ₹1,169.4 Lowest | 50 ₹2,923.5 |
| 4.00Taking up old Ductile Iron (DI) & Galvanized Iron (GI) tubing from the site complete all as specified and as directed (for the following sizes: -). | ||||||
| 4.10 | PP-R tubing 100 mm bore | 1,860 | Running Meter | 15 ₹27,900 | 10 ₹18,600 Lowest | 50 ₹93,000 |
| 4.20 | PP-R tubing 80 mm bore | 1,500 | Running Meter | 15 ₹22,500 | 9 ₹13,500 Lowest | 50 ₹75,000 |
| 4.30 | PP-R tubing 50 mm bore | 1,400 | Running Meter | 15 ₹21,000 | 8 ₹11,200 Lowest | 50 ₹70,000 |
| 4.40 | PP-R tubing 25 mm bore | 1,800 | Running Meter | 15 ₹27,000 | 7 ₹12,600 Lowest | 30 ₹54,000 |
| 4.50 | PP-R tubing 20 mm bore | 1,200 | Running Meter | 15 ₹18,000 | 6 ₹7,200 Lowest | 10 ₹12,000 |
| 5.00 | Supply and laying of centrifugally cast (spun) ductile iron with spigot & socket end, 100 mm dia class K-7 conforming to IS: 8329/2000 including fittings (such as bend, elbow, socket, union, etcetera) in trenches complete with (push-on) rubber gasket jointing and centrifugally applied inside cement mortar lining with portland slag cement as per IS: 455:1989 and external metallic zinc coating as per annex A of IS 8329 with finishing layer of Bitumen coating as per Annex C of IS: 8329. The standard lengths of the pipes are 5.50 meter (subject to tolerance as per clause 15.5.1 of IS: 8329:2000) all as specified and as directed.
Note: When the pipe is laid in a straight line, the third length is required to be connected by a union). | 1,860 | Running Meter | 1,500 ₹27,90,000 | 1,400 ₹26,04,000 Lowest | 1,450 ₹26,97,000 |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
21 May 2026, 6:00 pmClosed
CWE Amritsar
HQ CWE Amritsar
REPAIR MAINT AND UPKEEP OF BUILDING RISING MAINS VARIOUS DISTRIBUTION LINES AND CONNECTED MISC WORK AT NAMS
2026_MES_761576_1
83093/E8
Open Tender
Civil Works
Item Rate
180 days
GE NAMS
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE NAMS
₹1.8 L
Yes
4 Sept 2026
23 Apr 2026
28 May 2026
23 Apr 2026
21 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in trenches not exceeding 1.5 meter wide and not exceeding 1.5 meter in depth, for laying of Galvanized Iron (GI) or Ductile Iron (DI) tubing including getting out the excavated material in hard and dense soil, complete in all respects as specified and as directed. | |||||
| 2Returning filling, including spreading, leveling, watering, and well ramming in layers not exceeding 25 centimeter thick, complete in all respects as specified and as directed. | |||||
| 3Removing excavated material (soil) to a distance not exceeding 50 meters and depositing the material where specified and directed, at a level not exceeding 1.5 meter above the starting point. | |||||
| 4Taking up old Ductile Iron (DI) & Galvanized Iron (GI) tubing from the site complete all as specified and as directed (for the following sizes: -). | |||||
| 4.1 | DI / GI / tubing 100 mm bore | - | Running Meter | - | - |
| 4.2 | GI tubing 80 mm bore | - | Running Meter | - | - |
| 4.3 | GI tubing 50 mm bore | - | Running Meter | - | - |
| 4.4 | GI tubing 25 mm bore | - | Running Meter | - | - |
| 4.5 | GI tubing 20 mm bore | - | Running Meter | - | - |
| 5Taking up old Polypropylene Random Copolymer (PP-R) tubing from the site complete all as specified and as directed (for the following sizes: -). | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.34 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
83093Tender.pdf
Tender Documents • 0.96 MB
BOQ_853083.xls
BOQ • 0.34 MB
83093datecorrigendum4.pdf
PDF • 0.31 MB
dateCorrigendum83093.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .