Loading…
Loading…
Tender Value
₹9.4 L
EMD Value
₹94,000
Closing Date
29 Jul 2026, 5:00 pm3d left
EE MI BANDA
EE MI BANDA
Construction of Anicut Gaurikala Pratham Block Jaspura Lot-29
2026_UPMID_1171264_29
02/MI/JET/2026-27 Dt 15-07-2026
Open Tender
Civil Works
Item Rate
90 days
BANDA
Construction of Anicut Gaurikala Pratham Block Jaspura Lot-29
2 documents required · 2 mandatory
₹1,300
EE MI BANDA
₹94,000
EE MI BANDA
22 Jul 2026
22 Jul 2026
30 Jul 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH WORK IN EXCAVATION IN MAR KABAR RANKAR AND KANKAR MIX SOIL IN DIGGING OR IN EMBANKMENT INCLUDING LEAD UP TO 30.0 MTR AND LIFT UP TO 1.50 MTR INCLUDING DRESSING,MAKING PROFILE AND MANUAL COMPACTION BUT EXCLUDING MECHANICAL COMPACTION. | 124.34 | cum | 95.2 | ₹11,837.17 |
| 2 | SAME AS ABOVE BUT FOR LIFT 1.50 METER TO 3.0 METER | 1,266.64 | cum | 107.7 | ₹1,36,417.13 |
| 3 | IN SATURETED SOIL(excluding cost of dewatering) IN MAR KABAR AND RANKAR SOIL
A-1.50 M TO 3.0 M | 120.8 | cum | 125.5 | ₹15,160.4 |
| 4 | B-REMOVAL OF SLUSH | 80.53 | cum | 258.3 | ₹20,800.9 |
| 5 | PLAIN CEMENT CONCRETE WITH 40 MM GAUGE STONE BALLAST,APPRROVED QUARRY SAND AND CEMENT IN PROPORTION OF 1:3:6 IN FOUNDATION AND FLOOR INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK | 39.14 | cum | 5,053.68 | ₹1,97,801.04 |
| 6 | RANDOM COURSED RUBBLE STONE MASONARY WITH APPRROVED QUARRY KHANDA STONE, SAND AND CEMENT IN PROPORTION OF 1:4 IN FOUNDATION AND SUPER STRUCTURE INCLUDING SUPPLY OF ALL MATERIAL, LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK. | 76.8 | cum | 5,855.37 | ₹4,49,692.42 |
| 7 | PLAIN CONCRETE WITH 10-20 MM GAUGE STONE BALLAST,APPRROVED QUARRY SAND AND CEMENT IN PROPORTION OF 1:2:4 IN FOUNDATION AND FLOOR INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK | 8.23 | cum | 5,151.42 | ₹42,396.19 |
| 8 | STRUCK CEMENT POINTIMG WITH CEMENT MORTAR CONSISTING 1 PART CEMENT AND 2 PARTS OF APPROVED SAND ON STONE WORK INCLUDING SUPPLY OF ALL MATERIAL, LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK | 52.14 | cum | 140.1 | ₹7,304.81 |
| 9 | 20 MM TH PLASRER WITH CEMENT MORTAR IN 1:2 (ONE CEMENT AND TWO LOCAL SAND INCLUDING SUPPLY OF ALL MATERIAL, LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK | 27.15 | cum | 255.12 | ₹6,926.51 |
| 10 | DRY STONE BOULDER PITCHING | 3.75 | cum | 1,986.3 | ₹7,448.63 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.35 MB
BOQ_2198997.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].