| 1 | L1₹32.6 LAccepted-AOC 19 LAKE TEMPLE ROAD KOLKATA 700029 | KOLKATA | WEST BENGAL | 700029 | L1 | Accepted-AOC That the bis is L1 | |
| 2 | L2₹37.5 L+₹4.9 L (15.1%)Rejected-Finance | L2 | Rejected-Finance that the bid is not L1 | |
| 3 | L3₹41.9 L+₹9.3 L (28.5%)Rejected-Finance | L3 | Rejected-Finance that the bid is not L1 |
Tender Value
Refer Docs
EMD Value
₹55,000
Closing Date
15 Apr 2022, 1:00 pmClosed
EE II KNHED PW Dte.
KIT Building Annex, 4thFloor,P-16, India Exch. Place Extn., Kolkata -700073
Supply Installation of Defective condenser tubes and Complete testing commissioning of the said chiller unit installated at Super Specialty Block Hospital Presently as COVID Hospital under MCH Kolkata
2022_PWDE_374066_1
WBPWD/EEII/KNHED/NIQ-137/21-22
Open Tender
A/C ORG
Item Rate
60 days
Kolkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹55,000
8 Aug 2022
29 Mar 2022
18 Apr 2022
31 Mar 2022
15 Apr 2022
31 Mar 2022
Amount
Supply & Delivery up to the site of Condenser Tubes (Make- Trane Technologies India Pvt. Ltd.) having following specification:- As per Chiller serial no Tube Sl No GJ16M03515, Trane Part Code - TUB14348 and description - TUBE; FINNED; Size/Dimension 3/4"0.025" L=2991, C10 HI-TE (1. Materials must be verified with specification & approved from the EIC prior to any installation work 2. Material test certificate/ factory test report must be submitted prior to installation to the EIC)
Installation & commissioning of above said condenser tubes along and whole chiller system along with supply and providing of all required spares, refrigerant in need including leak testing and other procedures and all other utilities for SITC of the whole unit all complete for the system must be in running & working condition including testing & commissioning of Chiller unit & upto put in operation all complete as per direction of EIC ( For Chiller unit 1 & 2) (Commissioning report after successfull operation of the Chiller unit must be submitted to the EIC from OEM end)
Charges for Eddy Current Testing on Condenser Tubes of one number water cooled screw Chiller Unit (Capacity 250Tr, Make Trane, OEM) installed at Super Specilaty Block Hospital,MC&H,Kolkata (Chiller Number-1) Test to be conducted and report to be submitted by OEM "Trane" end For doing the above said work, all related arrangement like Draining of water, valve operation etc inluding site cleaning are to be done by Executing agency by co's own cost, Tools & tackles. Required Power supply will be provided by the Dpt but, necy power plug & other electrical arrangement must be done by agencie's own cost as per direction of EIC.
Special Terms and Conditions 1. It is stated that the above work place is existing COVID Hospital, In case of any mishap or accidental to any staff that deputed by the agency the whole responsibility is to be borne by the concern agency. 2. The Agency shall be responsible for provisioning of all COVID safety measures including regular sanitiziation of work places, vaccination of employees and compliance of stated directive and COVID appropriate norms. 3. All the issues related to the safety of the staffs should be taken care by the agency itself. (Defect Libilities period for 01 year from the date of completion of work)(Rate should be quotated including all taxes and duties)
ESKAY ENT5ERPRISE
SAVIO ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .