| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 CrAccepted-AOC | L1 | Accepted-AOC Selected as L1 bidder | |
| 2 | L1₹30.5 CrRejected-AOC | L1 | Rejected-AOC L1 bidder | |
| 3 | L1₹30.5 CrRejected-AOC D 1 1 GILLANDER HOUSE 8 N S ROAD KOLKATA 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | L1 | Rejected-AOC L1 bidder | |
| 4 | L1₹30.5 CrRejected-AOC | L1 | Rejected-AOC L1 bidder | |
| 5 | L2 bidder₹31.9 Cr+₹1.4 Cr (4.61%)Rejected-Finance | L2 bidder | Rejected-Finance Not participated in transparent lottery |
Tender Value
₹35.8 Cr
EMD Value
₹35.8 L
Closing Date
12 Aug 2024, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, DPI and Roads, Odisha
Office of the E.I.C. Civil, Odisha, Nirman Soudha, New Building, Unit-V, Bhubaneswar
Improvement such as widening and strengthening of Kodinga-Chatahandi road from 0/000 km to 19/611 km in the district of Nabarangpur under State Plan
2024_EICCL_103432_9
CE-DPI AND R- 01/2024-25
Open Tender
Civil Works - Roads
Percentage
600 days
In Nabarangpur Dist
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹35.8 L
Yes
7 Apr 2025
10 Jul 2024
13 Aug 2024
10 Jul 2024
12 Aug 2024
10 Jul 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1,57,265.2 | Sqm | 8.23 | ₹12,94,292.6 |
| 2 | Earth work in excavation in hard soil etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. | 255.96 | Cum | 269.7 | ₹69,032.41 |
| 3 | Earth work in excavation in all kinds of soil for road works & foundation of structures with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. | 21,603.17 | Cum | 74.71 | ₹16,13,972.83 |
| 4 | Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 16,238.58 | Cum | 35.8 | ₹5,81,341.16 |
| 5 | Loosening to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 31,131.32 | Cum | 35.99 | ₹11,20,416.21 |
| 6 | Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1,02,386.2 | Cum | 203.64 | ₹2,08,49,925.77 |
| 7 | Providing, filling clean sand of approved quality in foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 2,303.73 | Cum | 475.87 | ₹10,96,276 |
| 8 | Providing and laying Granular Sub-base with Grading-VI stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 31,836.19 | Cum | 1,803.68 | ₹5,74,22,299.18 |
| 9 | Scarifying and removing the existing bituminous road surface to the required depth as per approved drawing and technical specifications and disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 41,280.96 | Sqm | 5.99 | ₹2,47,272.95 |
| 10 | Reworking the scarified bituminous surface suitably after supplementing the base materials with sand and compacting finished surface as per approved drawing and technical specifications as per Section 900, Clause 501.8.3.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge. | 51,601.2 | Sqm | 11.04 | ₹5,69,677.25 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_502321.xls
BOQ • 0.92 MB
147926777.pdf
Tender Documents • 0.43 MB
147926781.html
Tender Documents • 0.05 MB
9.DTCN_Kodinga_Chatahandi.pdf
Tender Documents • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .