Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹51.7 LAccepted-Finance 383 TURKMANPUR BEHIND RAWAT PATHSHALA JAYNAGAR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 1 | Accepted-Finance Ambrish Kumar Mishra has been selected as the successful L1 bidder through randomization process conducted among all eligible bidders quoting the same lowest amount. | |
| 2 | 2₹51.7 LSame as 1Rejected-Finance GRAM SHIRSIYAN POST BALUA JAMNAD MAHARAJGANJ UTTAR PRADESH | MAHARAJGANJ | MAHARAJGANJ | UTTAR PRADESH | 2 | Rejected-Finance 2 | |
| 3 | 2₹51.7 LSame as 1Rejected-Finance 10 15 | AYODHYA | UTTAR PRADESH | 224001 | 2 | Rejected-Finance 2 | |
| 4 | 2₹51.7 LSame as 1Rejected-Finance WARD NO 01 NEHRU NAGAR PIPRADEURA SADAR MAHARAJGANJ UTTAR PRADESH | MAHARAJGANJ | MAHARAJGANJ | UTTAR PRADESH | 2 | Rejected-Finance 2 | |
| 5 | 2₹51.7 LSame as 1Rejected-Finance MU0 TURKMANPUR JANPAD GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 2 | Rejected-Finance 2 |
Tender Value
₹61.1 L
EMD Value
₹5.1 L
Closing Date
30 Sept 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Reconsturction of Ghughuli Shikarpur road to Ambedkar Gram Amoda Link road with 5 year Maintenance Lot no 1 of 1
2026_CEGKP_1184053_1
6844/33Com-Gkp Circle/2026 Dated 31-08-2026
Open Tender
Civil Works
Percentage
90 days
Mahrajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹5.1 L
8 Oct 2026
10 Sept 2026
30 Sept 2026
10 Sept 2026
30 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | WBM Grading-3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405(3)(A), MORD Sr.No. 4.7 By Manual Means. (Including labour cess but GST will be paid extra as applicable) | 247.5 | Cum | 5,164 | ₹12,78,090 |
| 2 | CC- Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, OPC pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501, MORD Sr. No. 6.4/1500 (Including labour cess but GST will be paid extra as applicable) | 450 | Cum | 10,263 | ₹46,18,350 |
| 3 | Construction of Subgrade and Earthen Shoulders/Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1(B), MORD Sr. No. 3.14. (Including labour cess but GST will be paid extra as applicable) | 450 | Cum | 78 | ₹35,100 |
| 4 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 3 Rs. 5931540.00 @ Zero percent & for 2nd year @ 0.25% | 1 | Job | - | - |
| 4.01 | 3rd Year cost of BOQ @ 0.50 % Item No. 1 to 3 | 1 | Job | - | - |
| 4.02 | 4rth Year cost of BOQ @ 0.75 % Item No. 1 to 3 | 1 | Job | - | - |
| 4.03 | 5th Year cost of BOQ @ 1.00 % Item No. 1 to 3 | 1 | Job | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
Tendernotice_2.pdf
PDF • 0.68 MB
Tendernotice_3.pdf
PDF • 0.44 MB
BOQ_2227182.xls
BOQ • 0.33 MB
7536.pdf
PDF • 0.23 MB
7395.pdf
PDF • 0.44 MB
7229.pdf
PDF • 0.53 MB
7154.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .