Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Tushar SharmaLikely winner L1₹23.0 LQualified BOOTH NO 29 GROUND FLOOR MOHALI GURUKUL PUBLIC SCHOOL SECTOR 69 SAS NAGAR MOHALI PUNJAB MOHALI PUNJAB 160062 | S A S NAGAR | PUNJAB | 160062 | L1 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
₹47,670
Closing Date
6 Sept 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SITC of 1 Number 8 Passenger Lift
6820630
GEM/2024/B/5324099
Two Packet Bid
SITC of 8 passenger 544 Kgs capacity microprocessor controlled A. C. variable voltage and variable
180 days
Delhi; New Delhi
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
3 yrs
₹3
₹47,670
17 Sept 2024
24 Aug 2024
6 Sept 2024
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | SITC of 8 passenger 544 Kgs capacity microprocessor controlled A. C. variable voltage and variable frequency, gearless, Through Type Opening Lift | Sub Head I
SITC of 8 passenger 544 Kgs capacity microprocessor controlled A. C. variable voltage and variable frequency, gearless, Through Type Opening Lift TTC, 180 Degree Opening of standard design conforming to the latest Lift Act, safety standards and modern lift practice having contract speed of 1 ms with a total travel of about 12 Mts. approx serving from G. F. to the T.F. with 3 stops and 3 landings. The lift shall be operated on DUPLEX SELECTIVE COLLECTIVE, microprocessor based single AUTOMATIC LUMINOUS PUSH BUTTON compatible to braille language. The car and landing doors should be power operated. The landing door and car door shall be mechanically connected so as to open or close simultaneously. The equipment shall be installed in the machine room directly above lift shaft. All lift equipment i.e., car, counter weight self levelling device, control devices, necessary control wiring, i.c. scaffolding, minor Civil works, incoming supply cables, machine room wiring and other electrical works related to lift work. The lift shall have fireman switch. The lift shall be equipped with Automatic Rescue Device including Battery charger for the ARD battery. A Hand rail not less than 600mm long at 900mm above floor level to be fixed adjacent to control panel in the lift car Voice announcement system in the car to announce the position of the elevator in the hoistway as the car passes or stops at a floor served by the elevator complete as required, as per detailed TS and requirements of lift installation, its components, safety devices, various types of controls etc. complete as required and as per specifications and scope of work attached. Note It will be the responsibility of the firm to get the installation cleared from Lift Inspector in order to ensure that installation has been carried out as per relevant Lift Act and relevant I.S. and safety standards.
As per Item No. 1 of SH I SECTION 9 PART B of Financial Schedule Of Work. | 1 | No | [email protected] | 180 |
| 2 | Comprehensive Preventive Breakdown Maintenance of above Lift 1 a | Sub Head II
Comprehensive Preventive Breakdown Maintenance of above Lift with all its associated items by deploying specialized man power, supplying and fixing required spares, tools and plant etc., to keep all the equipments healthy and operational including scheduled maintenance as per manufacturers recommendations, regularly and systematically examining, adjusting, lubricating and repairing plus replacing all spares including machine motor and controller and other parts, if any required etc complete as per terms, conditions and specifications attached.
During 1st Year of AMC after warranty period.
As per Item No. 1 a of Sub Head II SECTION9 PART B of Financial Schedule Of Work. | 12 | Months | [email protected] | 180 |
| 3 | Comprehensive Preventive Breakdown Maintenance of above Lift 1b | During 2nd Year of AMC after warranty period.
As per Item No. 1 b of Sub Head II SECTION9 PART B of Financial Schedule Of Work. | 12 | Months | [email protected] | 180 |
| 4 | Comprehensive Preventive Breakdown Maintenance of above Lift 1c | During 3rd Year of AMC after warranty period.
As per Item No. 1 c of Sub Head II SECTION9 PART B of Financial Schedule Of Work. | 12 | Months | [email protected] | 180 |
| 5 | Comprehensive Preventive Breakdown Maintenance of above Lift 1d | During 4th year of AMC after warranty period.
As per Item No. 1 d of Sub Head II SECTION9 PART B of Financial Schedule Of Work. | 12 | Months | [email protected] | 180 |
| 6 | Comprehensive Preventive Breakdown Maintenance of above Lift 1e | During 5th year of AMC after warranty period.
As per Item No. 1 e of Sub Head II SECTION9 PART B of Financial Schedule Of Work. | 12 | Months | [email protected] | 180 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_6820630.pdf
GEM_BID
atc_2024-08-24-11-32-57_6bf7aa3eb9349ef5d0e76f75bfae9858.pdf
BOQ
boq_item_sample_file_2024-08-24-11-32-57_d3bdcc48f6f6521756cc397639be84c5.csv
BOQ
ATC_ec87528b-4e8f-4776-8f491724480600851_sanjaygaur@bsnl.co.in.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .