Loading…
Loading…
Tender ID
Tender Value
₹22.2 L
EMD Value
₹44,400
Closing Date
30 Mar 2026, 11:00 amClosed
EO NAGAR PALIKA VATIKA (JAIPUR)
EO NAGAR PALIKA VATIKA (JAIPUR)
CONSTRUCTION OF NALI WORK AT NAGAR PALIKA VATIKA JAIPUR
2026_DLB_547884_8
NIT 16/2025-26 EO NAGAR PALIKA VATIKA
Open Tender
Civil Works
Percentage
60 days
JAIPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO NAGAR PALIKA VATIKA (JAIPUR)/MD RISL JAIPUR
₹44,400
Yes
21 Mar 2026
21 Mar 2026
30 Mar 2026
21 Mar 2026
30 Mar 2026
21 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil | - | cum | - | - |
| - | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth Rate for lead 5 km | - | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40
mm nominal size). | - | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size). | - | cum | - | - |
| - | Random rubble masonry with hard stone in foundation and plinth
including levelling up with cement concrete 1:6:12 (1 cement : 6
coarse sand : 12 graded stone aggregate 20 mm nominal size) upto
plinth level with Cement Mortar 1:6 ( 1-Cement : 6-Sand). | - | cum | - | - |
| - | Brick work with FPS bricks of class designation 75 in foundation
and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | - | cum | - | - |
| - | Half brick masonry with FPS brick of class designation 75 in
foundations and plinth in : cement mortar 1:4 (1 cement : 4 coarse sand) | - | sqm | - | - |
| - | Cement plastering including T&P, scaffolding, material and complete
labour, including cost of water, curing, racking of joints etc. with 20
mm cement plaster of mix : including Providing /mixing of synthetic
fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm
length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per
50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | - | sqm | - | - |
| - | Stone work ( machine cut edges) for wall lining upto 10 m height etc.
(Veneer work) backing filled with a grout of 12mm thick cement
mortar 1:3 (1 Cement : 3 coarse sand) and jointed with Cement
mortar 1:2 (1 cement : 2 stone dust) including rubbing and polishing
complete. (To be secured to the backing by means of cramps which
shall be paid for separately) Kota stone slabs exposed face dressed and rubbed. 25 mm thick. | - | sqm | - | - |
| - | Stone slab roofing on ground floor with fine grained stone slab
90mm average thickness from approved quarry including filling of
joints slab in cement sand mortar 1:4 with ceiling pointing in cement
sand mortar 1 : 3 complete as per specification for span: Above 2.00 metre and up to 2.50 metre | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Tender_document_16_8.pdf
Tender Documents • 0.76 MB
BOQ_976864.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .