Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAdmitted-Finance S 15 SACRED WORLD OPP SACRED HEART TOWN WANWADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | L1 | Admitted-Finance | |
| 2 | L2₹19.9 L+₹3.0 L (17.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹20.9 L+₹3.9 L (23.1%)Admitted-Finance SOMNATH NAGAR SR NO 43 1 2 GREWAL HOUSING SOCIETY PUNE NAGAR ROAD WADGAON SHERI PUNE 411 014 | PUNE | PUNE | MAHARASHTRA | 411014 | L3 | Admitted-Finance | |
| 4 | L4₹23.5 L+₹6.6 L (38.8%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹23.9 L+₹7.0 L (41.0%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MOHANLAL MATHRANI CONS. PVT. LTD. L4 | Sunshine Ventures L2 | Ridhi Constructions L6 | APB INFFRASTRUCTURE PVT LTD L5 | PAVEWAY CONSTRUCTIONS PRIVATE LIMITED L1 | Ganesh Enterprises L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair to potholes any depth, not exc 1 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm all as specified and directed. | 5 | 10 Sqm | 2,060 ₹10,300 | 1,000 ₹5,000 | 1,500 ₹7,500 | 150 ₹750 Lowest | 300 ₹1,500 | 2,000 ₹10,000 |
| 2.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exc 400 sqm and depth of potholes exc 50mm and n exc 100mm deep complete all as specified and direted. | 110 | 10 Sqm | 350 ₹38,500 | 50 ₹5,500 | 330 ₹36,300 | 360 ₹39,600 | 18 ₹1,980 Lowest | 50 ₹5,500 |
| 3.00 | M & L Laying and compacting 150 mm thick (compacted thickness) Wet Mix Macadam (WMM) laid in two layers grading as per table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with wate to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100KN static weight and consolidating to required gradien and camber complete all as specified and directed The finished surface tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and as directed by Engr-in-charge. | 110 | Sqm | 2,796 ₹3,07,560 | 1,950 ₹2,14,500 | 3,200 ₹3,52,000 | 350 ₹38,500 Lowest | 1,950 ₹2,14,500 | 350 ₹38,500 Lowest |
| 4.00 | M&L for preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 7.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 110 | 10 Sqm | 396 ₹43,560 | 250 ₹27,500 | 525 ₹57,750 | 250 ₹27,500 | 185 ₹20,350 Lowest | 300 ₹33,000 |
| 5.00 | M&L for preparing Black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 2.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 240 | 10 Sqm | 160 ₹38,400 | 150 ₹36,000 | 250 ₹60,000 | 110 ₹26,400 Lowest | 160 ₹38,400 | 350 ₹84,000 |
| 6.00 | M & L for premixed bituminous macadam using paving bitumen @ 4% by weight of total mix spread rolled and compacted to required gradient and camber for upto 50 mm consolidated thickness all as specified and directed, | 84 | Cum | 5,500 ₹4,62,000 | 5,200 ₹4,36,800 | 7,000 ₹5,88,000 | 6,250 ₹5,25,000 | 3,800 ₹3,19,200 Lowest | 6,000 ₹5,04,000 |
| 7.00 | M &L for preparing new Bituminous macadam Surface and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 2.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 170 | 10 Sqm | 160 ₹27,200 | 150 ₹25,500 | 100 ₹17,000 Lowest | 110 ₹18,700 | 145 ₹24,650 | 120 ₹20,400 |
| 8.00 | M & L for Bituminous premix semi dense asphaltic concrete 40 mm consolidated thickness with 5.5% binder content by weight of total mix using paving bitumen, rolled and compacted to required camber and gradient complete all as specified and directed. | 350 | 10 Sqm | 3,396 ₹11,88,600 | 2,900 ₹10,15,000 | 2,600 ₹9,10,000 | 4,250 ₹14,87,500 | 2,450 ₹8,57,500 Lowest | 3,000 ₹10,50,000 |
| 9.00 | M & L for moorum filling in berms of road laid in layers spread levelled and rammed including watering and well ramming with power road roller of spread thickness 100 mm complete all as specified and directed by Engr-in-Charge | 100 | 10 Sqm | 810 ₹81,000 | 900 ₹90,000 | 550 ₹55,000 | 565 ₹56,500 | 700 ₹70,000 | 300 ₹30,000 Lowest |
| 10.00 | M & L for marking for preparing bituminous surfaces of road and marking 2.5mm thick center lines, stop lines, dashes, arrows etc and the like n exc 10cm wide on roads pavement with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction complete all as specified and as directed by Engineer-in-Charge | 1,000 | RM | 60 ₹60,000 | 50 ₹50,000 | 320 ₹3,20,000 | 32 ₹32,000 Lowest | 45 ₹45,000 | 200 ₹2,00,000 |
Tender Value
₹38.8 L
EMD Value
₹77,700
Closing Date
6 Mar 2026, 6:00 pmClosed
Shri Vinay Kumar, IDSE, SE (SAG), CWE
Headquarters Commander Works Engineer (Army) 24 Assaye Building, Colaba Mumbai-400 005
SPECIAL REPAIRS TO INTERNAL ROAD ME LINE OF OD TALEGAON TO JCOs/OR ACCN AT SHIVAJI ENCLAVE UNDER GE DEHU ROAD
2026_MES_751619_1
85289/DR/E8
Open Tender
Civil Works - Roads
Item Rate
120 days
Dehu Road Pune
As per NIT and Tender documents.
8 documents required · 8 mandatory
₹500
GE DEHU ROAD PUNE
₹77,700
17 Mar 2026
6 Feb 2026
9 Mar 2026
6 Feb 2026
6 Mar 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair to potholes any depth, not exc 1 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm all as specified and directed. | 5 | 10 Sqm | - | - |
| 2 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exc 400 sqm and depth of potholes exc 50mm and n exc 100mm deep complete all as specified and direted. | 110 | 10 Sqm | - | - |
| 3 | M & L Laying and compacting 150 mm thick (compacted thickness) Wet Mix Macadam (WMM) laid in two layers grading as per table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with wate to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100KN static weight and consolidating to required gradien and camber complete all as specified and directed The finished surface tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and as directed by Engr-in-charge. | 110 | Sqm | - | - |
| 4 | M&L for preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 7.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 110 | 10 Sqm | - | - |
| 5 | M&L for preparing Black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 2.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 240 | 10 Sqm | - | - |
| 6 | M & L for premixed bituminous macadam using paving bitumen @ 4% by weight of total mix spread rolled and compacted to required gradient and camber for upto 50 mm consolidated thickness all as specified and directed, | 84 | Cum | - | - |
| 7 | M &L for preparing new Bituminous macadam Surface and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 2.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 170 | 10 Sqm | - | - |
| 8 | M & L for Bituminous premix semi dense asphaltic concrete 40 mm consolidated thickness with 5.5% binder content by weight of total mix using paving bitumen, rolled and compacted to required camber and gradient complete all as specified and directed. | 350 | 10 Sqm | - | - |
| 9 | M & L for moorum filling in berms of road laid in layers spread levelled and rammed including watering and well ramming with power road roller of spread thickness 100 mm complete all as specified and directed by Engr-in-Charge | 100 | 10 Sqm | - | - |
| 10 | M & L for marking for preparing bituminous surfaces of road and marking 2.5mm thick center lines, stop lines, dashes, arrows etc and the like n exc 10cm wide on roads pavement with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction complete all as specified and as directed by Engineer-in-Charge | 1,000 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tenderdocuments85289.pdf
Tender Documents • 0.92 MB
BOQ_841840.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .