Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.6 LAccepted-AOC VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | 1 | Accepted-AOC Eligible L-1 Bidder | |
| 2 | 2₹5.2 L+₹60,380.98 (13.2%)Rejected-Finance 620 SURI ROAD KHASKENDA CHINCHURIA MORE POST BAHULA DIST BURDWAN WB | BAHULA | BURDWAN | WEST BENGAL | 713322 | 2 | Rejected-Finance Quoted Rate more than L-1 Bidder | |
| 3 | 3₹5.2 L+₹66,280.98 (14.5%)Rejected-Finance ALINAGAR KHOTTADIH BARDDHAMAN BARDDHAMAN 713378 WEST BENGAL INDIA | BARDDHAMAN | BARDDHAMAN | WEST BENGAL | 713378 | 3 | Rejected-Finance Quoted Rate more than L-1 Bidder |
Tender Value
₹4.3 L
EMD Value
₹5,500
Closing Date
24 Sept 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE EnM
Sonepur Bazari Area
Diversion/dismantling/erection of feeder -15 near TRS from safety point of view under Sonepur Bazari Project.
2024_ECL_317268_1
GM/SBA/EnM/e-Tender/24-25/41
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Sonepur Bazari Area
Please refer tender documents.
6 documents required · 6 mandatory
₹5,500
12 Nov 2024
13 Sept 2024
26 Sept 2024
14 Sept 2024
24 Sept 2024
14 Sept 2024
14 Sept 2024 - 17 Sept 2024
Amount
Item Description/ Heading
Material Cost
Erection of 13/16 mtrs long Steel Tubular pole with cement concrete.
Supply, fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer.
Supply and erection of nuts, bolts, flats and erection of clamps.
Supply of 11KV disc insulator and hardware.
Supply of 11KV Pin insulator and hardware.
Supply of 7/14 SWG GI wire for earth continuity and 6/8 SWG for making and erection of cradle guard.
Supply and erection of HT Stay Set complete with stay plate, stay insulator, stay wire of required dimension and specification.
Dismantling of 6.6KV/220V transformer and re-arrangement of same to feeder 12.
Labour Cost:-
Erection of 13/16 mtrs long Steel Tubular pole with cement concrete.
Fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer.
Erection of nuts, bolts, flats and erection of clamps.
Installation of 11KV disc insulator and hardware.
Installation of 11KV Pin insulator and hardware.
Fixing of 7/14 SWG GI wire for earth continuity and 6/8 SWG for making and erection of cradle guard.
Fixing and erection of HT Stay Set complete with stay plate, stay insulator, stay wire of required dimension and specification.
Stringing of ACSR Dog/Wolf conductor.
Dismantling of 6.6KV/220V transformer and re-arrangement of same to feeder 12.
Loading of new poles from E&M workshop and unloading at field and unloading of dismanted pole from field to workshop.
Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required.
Dismantling of over head lines comprising of copper/aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
PINAK RANJAN SADHU
ABHIJIT MONDAL
techsummary_328908.pdf
PDF • 0.79 MB
finsummary_328908.pdf
PDF • 0.79 MB
317268.pdf
PDF • 0.74 MB
finance_328908.pdf
PDF • 0.25 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .