| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l-1₹29.1 LAccepted-AOC B 71 VIKAS NAGAR COLONY NEAR GURUDWARA KUSMUNDA DIST KORBA C G 495454 | KORBA | CHHATTISGARH | 495454 | l-1 | Accepted-AOC The work is awarded to L-1 bidder | |
| 2 | L-2₹27.2 L+₹2.5 L (10.1%)Rejected-Finance PARIJAT PALI ROAD DIPKA KORBA CG | GAURELLA PENDRA MARWAHI | CHHATTISGARH | 495119 | L-2 | Rejected-Finance DUE TO L-2 BIDDER | |
| 3 | L-3₹27.3 L+₹2.7 L (10.8%)Rejected-Finance BHAGWAN NIWAS WARD NO 30 DADARKHURD DADAR NALLA KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | L-3 | Rejected-Finance DUE TO L-3 BIDDER | |
| 4 | L-4₹39.4 L+₹14.7 L (59.6%)Rejected-Finance R P NAGAR KORBA C G DIST KORBA C G PIN 495678 | 495678 | L-4 | Rejected-Finance DUE TO L-4 BIDDER |
Tender Value
₹51.0 L
EMD Value
₹63,800
Closing Date
8 Sept 2022, 5:00 pmClosed
General Manager (Civil)
Office of the General Manager (Civil), Gevra Area
Repairing and shifting of compound wall on ETP side of Main excavation workshop and AC canteen falling in the area of construction of new RCC bunker of upcoming silo 5 and 6 at Gevra Project
2022_SECL_254025_1
SECL/GA/GM(C)/ETN/22-23/92 dtd 20/08/2022
Open Tender
Civil Works - Others
Item Rate
120 days
Gevra Area
As per NIT
5 documents required · 5 mandatory
₹63,800
16 Nov 2022
23 Aug 2022
10 Sept 2022
23 Aug 2022
8 Sept 2022
24 Aug 2022
23 Aug 2022 - 1 Sept 2022
Amount
Part-A (Compound wall)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in : Cement mortar 1:6 (1 cement : 6 Coarse sand)
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Part-B-Dismantling at existing compound wall
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
Labour rate 'Structrual steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Total impact of GST for the purpose of CTC
RADHA MOHAN SINGH
m/s bhagwan saran and associates
BHAKULAL SAHU
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .