Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.9 CrAccepted-AOC | ₹12.9 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹13.2 Cr+₹28.7 L (2.22%)Rejected-Finance KOLASIB MIZORAM | NA | NA | 796186 | ₹13.2 Cr+₹28.7 L (2.22%) | 2 | Rejected-Finance 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive. Please Check Minutes of Evaluation |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive. Please Check Minutes of Evaluation |
Tender Value
₹12.9 Cr
EMD Value
₹12.9 L
Closing Date
20 May 2024, 6:00 pmClosed
Chief Executive Officer, MiRRDA
Tuikhuatlang, Aizawl, Mizoram
Upgradation and Maintenance of Phairaung to Thenhlum, Bolia to Thenhlum Road
2024_MZPWD_133732_1
13/MiRRDA/2024
Open Tender
Civil Works - Roads
Item Rate
540 days
Lunglei
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹12.9 L
21 Aug 2024
8 Apr 2024
21 May 2024
8 Apr 2024
20 May 2024
8 Apr 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1FORMATION CUTTING & SETTING OUT WORKS | |||||
| 1.1 | Clearing and grubbing of road land including uprooting wild vegetation, grass, brushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per technical specification clause 201. (I) By Manual means. (B) In area of thorny Jungle. | 1 | Hectare | - | - |
| 2Cutting of trees Cutting of trees including cutting of trunks,branches and removal of stumps and root, refilling, compaction of backfilling and stacking of serviceable materials by manual means with all lifts as per technical specification clause 201 (A) Lead upto 100m. (i) Girth above 300mm to 600mm. | |||||
| 3Cutting of trees Cutting of trees including cutting of trunks,branches and removal of stumps and root, refilling, compaction of backfilling and stacking of serviceable materials by manual means with all lifts as per technical specification clause 201 (A) Lead upto 100m. (ii) Girth above 600mm to 900mm. | |||||
| 4Cutting of trees Cutting of trees including cutting of trunks,branches and removal of stumps and root, refilling, compaction of backfilling and stacking of serviceable materials by manual means with all lifts as per technical specification clause 201 (A) Lead upto 100m. (iii) Girth above 900mm to 1800mm. | |||||
| 5Setting Out Construction of reference pillar as per Fig 1600.1 (b) as per drawing and technical specification clause 1602.1 | |||||
| 6Construction of back pillar as per Fig 1600.1 (c) as per drawing and technical specification clause 1602.3 | |||||
| 7Construction of Job pillar as per Fig 1600.1 (d) as per drawing and technical specification clause 1602.4 | |||||
| 8 | Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1 | 0.8 | cum | - | - |
| 9 | Excavation in Hilly Areas in Ordinary Rock not requiring blasting by mechanical means including cutting and trimming of side slopes and disposal of cut materials with a lift upto 1.5 m and a lead upto 20 m as per Clause 1603.2 | 1 | cum | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_209693.xls
BOQ Document • 0.28 MB
143129858.pdf
Tender Document • 0.54 MB
PTBT.pdf
Tender Document • 1.25 MB
143129860.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .