Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 23 FLAT NO 1 RIVER VIEW APARTMENTS CRESCENT PARK 1ST STREET GANDHI NAGAR ADYAR CHENNAI 600020 | CHENNAI | CHENNAI | TAMIL NADU | 600020 | Admitted-Finance |
| 2 | Admitted-Finance 8 1 THAIMOOGAMBIGAI NAGAR SURYA NAGAR K PUDUR MADURAI 07 | MADURAI | MADURAI | TAMIL NADU | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Not Admitted-Fee/PreQual/Technical EMD Not Matching |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical EMD Not Matching |
Tender Value
₹16.2 L
EMD Value
₹16,300
Closing Date
22 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Supply and erection of KCR stub, supply, transport and erection tower and extension parts at intermittent locations for erection of 110 KV SC line on DC tower from Sankarapuram 230KV SS upto common point of Ulundurpet - Thiyagadurgam 110KV feeder
2021_EB_216510_1
CE TP-II TRY C-33 2021-22
Open Tender
Civil Works
Works
150 days
Villupuram
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹16,300
Yes
3 Jan 2022
8 Dec 2021
23 Dec 2021
8 Dec 2021
22 Dec 2021
8 Dec 2021
180 days
Amount
Line works
Supply, Transporting and fixing of KCR stub and cleat using levelling instrument with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for template ,labour, fabrication charges , lead, lift etc complete. As per approved drawing and BOM .
Supply,Transport and erection of GI tower angles ,square cross arm including cost of materials, T &P,labour, lead, lift etc complete.as per approved drawing and BOM.(MS tower parts)
Supply and fixing of hot dipped glavanised iron Bolt and Nut, packing washers,Spring washers, conforming to IS 2427/1988, and IS 387 part XIII of latest issue including cost of materials, lead,lifts,etc,complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
Vasantha Kumar.S
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .